WA0002-EM020722ENGINEER'S OPINION OF
PROBABLE CONSTRUCTION COST
Project Name: Golden Triangle Mobile Home Park
Prepared By. Pacheco Koch Consulting Engineers (JDD)
PK No.: 2269 -02.022
Date: 07/22/2002
Item
No.
Est.
Quant.
Unit
Descri tion
Unit
Price
Total
1
250
SY
Clearing and Grubbing
$20.00
$5,000.00
2
675
LF
Full Depth Sawing for Asphalt Concrete Pavement
$4.00
$2,700.00
3
300
SY
Remove Asphalt Concrete Pavement
$10.00
$3,000.00
4
10
LF
Remove & Replace Concrete Curb
$20.00
$200.00
5
101
LF
Reinforced Concrete Curb
$5.00
$50.00
6
55
TON
Asphalt Concrete Fine Grade Binder Course
$58.00
$3,190.00
7
55
TON
As halt Concrete Course Grade Binder Course
$58.00
$3,190.00
8
350
CY
Modified Flowable Fill
$37.00
$12,950.00
9
970
LF
8" Water PVC Pie
$4G•0
$38,$40.00
10
30
LF
6" Water PVC Pie
$35.00
$1,050.00
11
1 75
LF
12" Bore with Steel Encasement
$235.00
$17,625.00
12
1 31
EA
8" Water Valve
$1,025.00
$3,075.00
13
1 31
EA
6" Water Valve
$700.00
$2,100.00
14
1 21
EA
8" X 8" Tapping Sleeve
$2,400.00
$4,800.00
15
1 31
EA
Fire Hydrant
$2,200.00
$6,600.00
16
1 11001
LF
Water Trench Safety & Support
$2.00
$2,200.00
17
1
EA
Water Test
$1,400.00
$1,400.00
18
1
LS
Temporary Traffic Control
$15,000.00
$15,000.00
19
1
EA
Drop Inlet Protection
$200.00
$200.00
20 2701 LF Silt Fence 1 $10.00
The quantities and prices shown hereon are an indication of the Engineers Sub -Total
opinion of probable construction costs associated with the referenced Engineering (10 %)
project and are NOT a guarantee of individual or total construction costs. Contingency (20%)
TOTAL
1 $2,700.00
1 $125,830.00
$12,583.00
$25,166.00
$163,579.00
2269-08