Loading...
WA0002-EM020722ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST Project Name: Golden Triangle Mobile Home Park Prepared By. Pacheco Koch Consulting Engineers (JDD) PK No.: 2269 -02.022 Date: 07/22/2002 Item No. Est. Quant. Unit Descri tion Unit Price Total 1 250 SY Clearing and Grubbing $20.00 $5,000.00 2 675 LF Full Depth Sawing for Asphalt Concrete Pavement $4.00 $2,700.00 3 300 SY Remove Asphalt Concrete Pavement $10.00 $3,000.00 4 10 LF Remove & Replace Concrete Curb $20.00 $200.00 5 101 LF Reinforced Concrete Curb $5.00 $50.00 6 55 TON Asphalt Concrete Fine Grade Binder Course $58.00 $3,190.00 7 55 TON As halt Concrete Course Grade Binder Course $58.00 $3,190.00 8 350 CY Modified Flowable Fill $37.00 $12,950.00 9 970 LF 8" Water PVC Pie $4G•0 $38,$40.00 10 30 LF 6" Water PVC Pie $35.00 $1,050.00 11 1 75 LF 12" Bore with Steel Encasement $235.00 $17,625.00 12 1 31 EA 8" Water Valve $1,025.00 $3,075.00 13 1 31 EA 6" Water Valve $700.00 $2,100.00 14 1 21 EA 8" X 8" Tapping Sleeve $2,400.00 $4,800.00 15 1 31 EA Fire Hydrant $2,200.00 $6,600.00 16 1 11001 LF Water Trench Safety & Support $2.00 $2,200.00 17 1 EA Water Test $1,400.00 $1,400.00 18 1 LS Temporary Traffic Control $15,000.00 $15,000.00 19 1 EA Drop Inlet Protection $200.00 $200.00 20 2701 LF Silt Fence 1 $10.00 The quantities and prices shown hereon are an indication of the Engineers Sub -Total opinion of probable construction costs associated with the referenced Engineering (10 %) project and are NOT a guarantee of individual or total construction costs. Contingency (20%) TOTAL 1 $2,700.00 1 $125,830.00 $12,583.00 $25,166.00 $163,579.00 2269-08