Loading...
ST0102-CS020722T H [ · ,~ I T Y · 0 F COl'FELL July 22, 2002 Mr. Mark Askew Affordable Residential Communities 1204 HJllcrest Gainesville, Texas 76240 RE: Ruby Road Project ST 01-02 Dear Mr. A~kew: The City of Coppell intends to construct improvements along Ruby Road in the vicinity of one of your residential communities. The Oak Park mobile home community has two entrances and frontage along the road. The improvements will consist of the realignment and reconstruction of Ruby Road from a two-lane asphalt roadway to a two-lane concrete roadway with drainage improvements, and the installation of approximately 2450 linear feet of 12-inch water line and 730 linear feet of 8-inch sewer line. The construction of this project is anticipated to begin in September 2002 with an estimated construction time of four months. You will be notified in advance of the actual construction start date. It will be necessary to enter and move equipment onto the Oak Park property for construction purposes. The proposed work on the property is between the existing wooden fence and the right-of-way and generally consists of slope grading necessary to tie the proposed finished ground elevation into the existing ground elevation and construction necessary to match the proposed drive approaches to the existing drive- approaches. Please refer to the enclosed plan-profile and grading sheets. The City will restore the land back to its original condition to the maximum extent practicable. Where sod, shrubbery, and plants are removed during the construction, such areas will have the same sod, shrubbery, and plants replaced in their prior positions. Your consideration of this matter is appreciated. Should you have any questions or need any additional information please call me at 972-304-7019. Sincerely, suzan~c. Taylor C.I.P.~oordinator Enclosures