CONCRETE CYLINDER TEST REPORT
, ~" Uline Facility
~" Freeport Parkway
Coppell, Texas
REPORTED TO: Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
CONTRACTOR: Duke Construction
Location of Sample
Set Number I Location
1 Paving: 190'S, 40'W of N.W. building corner
2 Paving: 30'S, 20'W of N.W. building corner
Desitin Information
Source of Concrete I Mix Identification I
TX 8273
REPORT NO. 81
REG PROJECT NO. 9056
SAMPLE DATE: 08-07-02
TECHNICIAN: A. Cervantes
Quantity Represented
30/19O
150/190
Specified Strength p.s.i.
4000
Test Results
Set Cylinder Age @ Total Load Compressive [ Average
No. ID Date Tested Test lbs. Strength p.s.i.I Strength p.s.i.
1 2255 08-14-02 7 90640 3210
2255 09-04-02 28 124840 4420
2255 09-04-02 28 127850 4530 4480
2255 Hold H
2 2256 08-14-02 7 91490 3240
2256 09-04-02 28 130850 4630
2256 09-04-02 28 121410 4300 4470
2256 Hold H
Cylinder Data
I Set Cylinder Time of Concrete Air Ticket
No. ID Slump Sample I Air Temp. Temp. Entrainment Number
1 2255 5.00 3.00AM 77 84 4.9 N/A
2 2256 4.75 5:20AM 81 90 5.'i N/A
Mail
Distribution:
(1) Duke Realty Corporation/
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1) Pacheco Koch Consulting/
Mr. Jack Evans
(1) Haris Engineering, Inc./
Mr. Ali Haris
(1) Horn-Chandler-Thomas, Inc./
Ms. Diane Coulson
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Osburn Contractors/
Mr. Collin LaFavors
Submitted by:_.~
REED ENGINEERING GROUP, IN
Original Signed By
Keith Atkins
KENje
2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · F^X [214] 3500019
GEOTECHNICAL AND ~ F:q r-i U F=~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
~,.,,'~Uline Facility
Freeport Parkway
Coppell, Texas
REPORTED TO: Duke Realty Corporation
5495 Beltline Road. Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
CONTRACTOR: Duke Construction
REPORT NO. 81
REG PROJECT NO. 9056
SAMPLE DATE: 08-07-02
TECHNICIAN: A. Cervantes
Location of Sample
Set Number I Location I Quantity Represented
Paving: 190'S, 40'W of N.W. building corner 30/190
Paving: 30'S, 20'W of N.W. building corner 150/190
Design Information
Source of Concrete
TXI
Mix Identification I Specified Strength p.s.i.
8273 4000
Test Results
Set Cylinder Age @
No. ID Date Tested Test
Total Load Compressive I Average
lbs. Strength p.s.i. Strength p.s.i.
1 2255 08-14-02 7 90640 3210
2255 09-04-02 28
2255 09-04-02 28
2255 Hold H
2 2256 08-14-02 7 91490 3240
2256 09-04-02 28
2256 09-04-02 28
2256 Hold H
Cylinder Data
Set Cylinder I Time of
No. I ID Slump Sample Air Temp.
2 2255 5.00 3.00AM 77
2256 4.75 5:20AM 81
ConcreteI Air I TicketI
Temp. Entrainment Number
84 4.9 N/A
90 5.1 N/A
Mail
Distribution:
(1) Duke Realty Corporation/
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1) Pacheco Koch Consulting/
Mr. Jack Evans
(1) Haris Engineering, inc./
Mr. Ali Haris
(1) Horn-Chandler-Thomas, Inc./
Ms. Diane Coulson
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Osburn Contractors/
Mr. Collin LaFavors
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KENje