Loading...
Freeport NIP(7.9)-LR020807I~EE ~ I EI~I~ II~EEI~II~E~ GEOTECHNJCALAND ~ J~l I~J i I p ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT , ~" Uline Facility ~" Freeport Parkway Coppell, Texas REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox CONTRACTOR: Duke Construction Location of Sample Set Number I Location 1 Paving: 190'S, 40'W of N.W. building corner 2 Paving: 30'S, 20'W of N.W. building corner Desitin Information Source of Concrete I Mix Identification I TX 8273 REPORT NO. 81 REG PROJECT NO. 9056 SAMPLE DATE: 08-07-02 TECHNICIAN: A. Cervantes Quantity Represented 30/19O 150/190 Specified Strength p.s.i. 4000 Test Results Set Cylinder Age @ Total Load Compressive [ Average No. ID Date Tested Test lbs. Strength p.s.i.I Strength p.s.i. 1 2255 08-14-02 7 90640 3210 2255 09-04-02 28 124840 4420 2255 09-04-02 28 127850 4530 4480 2255 Hold H 2 2256 08-14-02 7 91490 3240 2256 09-04-02 28 130850 4630 2256 09-04-02 28 121410 4300 4470 2256 Hold H Cylinder Data I Set Cylinder Time of Concrete Air Ticket No. ID Slump Sample I Air Temp. Temp. Entrainment Number 1 2255 5.00 3.00AM 77 84 4.9 N/A 2 2256 4.75 5:20AM 81 90 5.'i N/A Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn-Chandler-Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Osburn Contractors/ Mr. Collin LaFavors Submitted by:_.~ REED ENGINEERING GROUP, IN Original Signed By Keith Atkins KENje 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · F^X [214] 3500019 GEOTECHNICAL AND ~ F:q r-i U F=~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT ~,.,,'~Uline Facility Freeport Parkway Coppell, Texas REPORTED TO: Duke Realty Corporation 5495 Beltline Road. Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox CONTRACTOR: Duke Construction REPORT NO. 81 REG PROJECT NO. 9056 SAMPLE DATE: 08-07-02 TECHNICIAN: A. Cervantes Location of Sample Set Number I Location I Quantity Represented Paving: 190'S, 40'W of N.W. building corner 30/190 Paving: 30'S, 20'W of N.W. building corner 150/190 Design Information Source of Concrete TXI Mix Identification I Specified Strength p.s.i. 8273 4000 Test Results Set Cylinder Age @ No. ID Date Tested Test Total Load Compressive I Average lbs. Strength p.s.i. Strength p.s.i. 1 2255 08-14-02 7 90640 3210 2255 09-04-02 28 2255 09-04-02 28 2255 Hold H 2 2256 08-14-02 7 91490 3240 2256 09-04-02 28 2256 09-04-02 28 2256 Hold H Cylinder Data Set Cylinder I Time of No. I ID Slump Sample Air Temp. 2 2255 5.00 3.00AM 77 2256 4.75 5:20AM 81 ConcreteI Air I TicketI Temp. Entrainment Number 84 4.9 N/A 90 5.1 N/A Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, inc./ Mr. Ali Haris (1) Horn-Chandler-Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Osburn Contractors/ Mr. Collin LaFavors Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KENje 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · VEL [214] 350 5600 · FAX [214] 350 0019