Loading...
CF-Coppell Rd SC-LR020822Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF tN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 22 August 2002 PROJECT: Field Service Offices & Maintenance Fac. JOB NO.: 01.1054 Coppell, TX MATERIAL DESCRIPTION: 1) Lime Stabilized Subgrade -Dark Brown Clay with Lime ASTM D 698 STANDARD PROCTOR: 1) 84.0 pcf @ 30.5% Moisture MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION °k PCF % % Subgrade @ West Parking Lo 127) 60' south of entry drive 5' east of west curb 128) 40' south of entry drive 70' east of west curb 129) 30' north of entry drive 15' west of east curb Subgrade at East Parking Area 130) 40' north and 15' east of southeast corner of concrete paving 131) centerlina of e:~try driva 15' east of concrete paving 132) centerline of service center 15' east of concrete paving 'Test results indicate fill is not corStl ~v 1 1 1 1 1 1 Final 26.5 • Final 22.0• Final 23.9 • Final 35.0 Final 27.1' Final 24.2' 81.4 96.8 85.6 101.9 77.6 92.4` 74.1 88.1 ` 87.9 97.5 79.4 94.4' to required density/moisture. Contractor notified. Y ~o . ~ ~a,~ ~Q; ~) TECHNICIAN: MFM \ ,~ ~ ~- OISTRt8UT10N: (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. l"l 2870 Walnut HIII Une Dallas, Texne 75229 (214) 351-6419 95+ -1 % to +3°~ Of Optimum Fax (214) 351-5148