Freeport NIP(7.9)-LR020823Proctor
No.
ASTM
Standard
Description
Optimum
Moisture,
Maximum
Density, PCF
1
D -698 Dark brown clay 19.0
103.0
2
D -698 Dark brown clay w /yellowish brown sand 15.0
111.0
3
D -698 Light brown clay (lime- treated) 17.1
98.9
4
D -698 Dark brown clay w /trace light gray 20.3
101.6
yellowish brown clay
5
D -698 Dark gray clay 18.0
105.4
Depth
Below
Field
Field
Test
Final S. G.
Density
Moisture
Proctor
Compaction
No.
Date
Location
(feet)
(pcf)
ID
Level
141
08 -08 -02 Storm Line: STA 0 +50(1) 3.0 97.2 23.7
3
95.7
142
Storm Line: STA 0 +51(1) 2.3 98.9 23.4
3
97.3
143
Storm Line: STA 0 +52(1) 1.5 98.4 23.1
3
96.9
144
Storm Line: STA0 +53(1) 0.8 97.0 24.6
3
95.5
145
Storm Line: STA 0 +54(1) 0.0 98.3 23.7
3
96.8
146
Storm Line: STA 1 +75(1) 1.5 98.7 22.9
3
97.1
147
Storm Line: STA 1 +78(1) 0.8 98.0 24.7
3
96.5
148
Storm Line: STA 1 +80(1) 0.0 97.5 22.3
3
96.0
149
Storm Line: STA 3 +10(1) 1.5 98.5 21.8
3
96.9
150
Storm Line: STA 3 +13(1) 0.8 98.1 21.4
3
96.6
151
Storm Line: STA3 +15(1) 0.0 97.4 22.4
3
95.9
REPORTED TO: Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
CONTRACTOR: Duke Construction
Mail
Distribution:
(1) Duke Realty Corporation/
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1) Pacheco Koch Consulting!
Mr. Jack Evans
(1) Haris Engineering, Inc.!
Mr. Ali Hails
(1) Horn Chandler- Thomas, Inc.!
Ms. Diane Coulson
(1) City of Coppell /Mr. Larry Davis
(1) City of Coppell /Mr. Lee Stone
FEEL]
REPORT OF FIELD DENSITY TESTS
Uline Facility
Freeport Parkway
Coppell, Texas
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT NO. 77
REPORT DATE: 08 -23 -02
REG PROJECT NO. 9056
TECHNICIAN: J. Baradziej
PAGE: 1 of 1
Comments: Where tested, materials were in compliance with project specifications.
Footnote: (1) Locations referenced from curb inlets north to detention pond.
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith E. Atkins
Manager, CMT
KEA /cn
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
E Ir
G R O U
REPORTED TO: Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
CONTRACTOR: Duke Construction
Items Observed:
Reference Plans or Notes Used:
x
There was no deviations noted.
Sheet S -111
Mail
Distribution: (1) Duke Realty Corporation!
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1) Pacheco Koch Consulting/
Mr. Jack Evans
(1) Haris Engineering, Inc.!
Mr. Ali Haris
(1) Horn Chandler- Thomas, Inc./
Ms. Diane Coulson
(1) City of Coppell /Mr. Larry Davis
(1) City of Coppell /Mr. Lee Stone
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
go s•.►"^ Uline Facility
Freeport Parkway
Coppell, Texas
Pier Caps: Line 9 from B to G.
filf F
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
EEL? EI 1 rIEEFRII
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT NO. 78
REPORT DATE: 08 -23 -02
REG PROJECT NO. 9056
DATE OBSERVED: 08 -09 -02
TECHNICIAN: F. Thornton
PAGE: 1 of 1
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Ronald F. Reed, P.E.
BW /cn
GF 1 LJ