Loading...
SC-Coppell MSW-LR020823FUGRO SOUTH, INC. =1�� 2M 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH CLIENT: Coppell ISD, c/o K A Sparks PROJECT: <Coppell Middle School West, Coppell, F CONCRETE REPORT Report Date: August 23, 2002 Project No.: 0701 -2192 I SAMPLE DATE: July 24, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: CMS West 54712 CONCRETE SUPPLIER: Hanson 83 PLANTITRUCK: 29/02 92 MIX ID NUMBER: 9351 7:45 a.m. AIR ( %) (ASTM C -231) : 5.5 8:15 a.m. WATER ADDED (gal): 10 sunny/ clear SLUMP (in.) (ASTM C -143) : 43/4 Paving Wrangler Circle 375 feet north of Wrangler Road CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMS 229 7 7 -31 86050 3040 3000 /28 days CMS 230 28 8 -21 109180 3860 CMS 231 28 8 -21 104830 3710 CMS 232 Hold Fracture mode is (A) unless otherwise noted pecifications: I Making & ASTM C -31 Testing ASTM C -143, Types of N Z Curing: Methods: ASTM C -39 Fracture: A® 13 C D I REMARKS: Unit weight: 143.92 Ibs/ cu.ft Technician: Thomas Lampitt FUGRO SOUTH INC. rii �1J 1 SMH/ nl /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbe� Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. :1 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax(972)620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: August 23, 2002 PROJECT: Coppell Middle School West, Coppell, Texas Project No.: 0701 -2192 SAMPLE DATE: July 24, 2002 1 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: CMS West 54708 CONCRETE SUPPLIER: Hanson 79 PLANT/TRUCK: 29/1089 88 MIX ID NUMBER: 9351 7:38 a.m. AIR ( %) (ASTM C -231) : 5.2 7:52 a.m. WATER ADDED (gal): 30 sunny/ clear SLUMP (in.) (ASTM c -143) : 6 1/2 paving Wrangler Circle 250 feet (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMS 225 7 7 -31 70920 2510 3000 /28 days CMS 226 28 8 -21 101870 3600 CMS 227 28 8 -21 99750 3530 CMS 228 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A g C Z .0 REMARKS: Technician: Thomas Lampitt FUGRO SOUTH INC. Revie ed By: SMH/ nl /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. 6R0 G� 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: August 23, 2002 PROJECT: Coppell Middle School West, Coppell, Texas Project No.: 0701 -2192 SAMPLE DATE: July 24, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: CMS West 54695 CONCRETE SUPPLIER: Hanson 81 PLANT/TRUCK: 29/103 91 MIX ID NUMBER: 9351 4:15 a.m. AIR ( % ) (ASTM C -231) : 5.2 4:30 a.m. WATER ADDED (gal): 15 gallons clear & humid SLUMP (in.) (ASTM C-143): 51/4 Paving Wrangler Circle at 100 feet north of Wrangler Road at 25 feet west of sidewalk. CMS 221 7 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMS 221 7 7 -31 82230 2910 3000 /28 days CMS 222 28 8 -21 103390 3660 CMS 223 28 8 -21 103440 3660 CMS 224 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of 0 Z Curing: Methods: ASTM C -39 Fracture: A® g C D REMARKS: Technician: Thomas Lampitt FUGRO SOUTH INC. Review d By: SMH/ nl /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl