Loading...
St Joseph-LR020807FIEED DENSITY TESTING Report Number: 94021187.0058 Service Date: July 26, 2002 Client: St. Joseph Village, Inc. Attn: Joseph Dingman 13223 Glad Acres Drive Dallas TX 75234 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: August 07, 2002 Project: St. Joseph Village 1201 East Sandy Lake Rd Coppell, TX 75019 . Project Number: 94021187 Material Information Material Laboratory No. Test Method Description and Classification Lab Test Data Proiect Requirements Optimum Max. Lab Water Water Dry Unit Content Minimum Dry Content Weight Range Unit Weight (%) (pcf) (%) (% compaction) 1.211870001 ASTM D 698 2.211870003 ASTM D 698 Med brown silty clay w/gravel Reddish tan & med brown silty sandy clay Field Test Data Test No. Test Location 629 630 631 632 633 634 635 636 637 638 Paving Subgrade off of Main Entry Drive 10' N & 60' E of SE cor. of intersection with Area A Cottage S. Side Drive 10' N & 5' W of SE cor. of intersection with Area A Cottage S. Side Dnve 80' S & 10' W of SE cor. of intersection with Area A Cottage S. Side Drive 60' S & 80' W of SE cot. of intersection with Area A Cottage S. Side Drive 20' N & 20' W of SE cot. of intersection with Area A Cottage S. Side Drive 30' N & 80' W of SE cor. of intersection with Area A Cottage S. Side Drive 10' N & 135' W of SW cor. of intersection with Area A Cottage S. Side Drive 15' N & 205' W of SW cor. of intersection with Area A Cottage S. Side Drive 20' S & 135' W of SW cor. of intersection with Area A Cottage S. Side Drive 30' S & 205' W of SW cot. of intersection with Area A Cottage S. Side Drive 17.6 107.9 -1/+3 95 13.2 117.1 -1/+3 95 Probe Water Dry Unit Dry Unit LiflJ Mat. Depth Content Weight Weight Elevation No. (inches) (%) (pcf) (% compaction) Final 2 6 8.8 * 121.5 104 Final 2 6 9.3 * 121.0 103 Final 2 6 12.4 117.9 101 Final 2 6 10.2 * 120.1 103 Final 2 6 13.0 117.3 100 Final 2 6 12.7 117.6 100 Final 2 6 14.9 115.5 99 Final 2 6 13.7 116.0 99 Final 2 6 16.0 114.9 98 Final 2 6 14.8 115.7 99 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s} referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 2 0~.~.~.0~-....K., FIELD DENSITY TESTING Client: St. Joseph Village, Inc. Field Test Data Test No. Test Location Probe Lift/ Mat. Depth Elevation No. (inches) 639 100' S & 135' W of SW cor. of intersection with Area A Cottage S. Side Drive 640 110' S & 205' W of SW cor. of intersection with Area A Cottage S. Side Drive Water Line Backfill Under Main Bldg. Entrance Drive 641 75' N & 15' E of SE cor. of Drive 642 10' N & 20' E of SE cor. of Drive 643 80' N & 15' E of~E cot. of Drive 644 15' N & 20' E of SE cor. of Drive 645 35' S & 10' W of SE cor. of Drive 646 40' S & 30' W of SE cor. of Drive Datum: BEG = below existing grade ENGINEERING Project Number:94021187 Report Number: 94021187.0058 Water Dry Unit Dry Unit Content Weight Weight (%) (pcf) (% compaction) Final 2 6 16.0 114.7 98 Final 2 6 14.7 115.8 99 2'BEG 1 6 10.2 * 110.9 103 Final 1 6 11.1 * 110.0 102 2'BEG 1 6 11.7 * 109.4 101 Final 1 1 9.9 * 111.2 103 2'BEG 1 6 10.0 * 111.1 103 2'BEG 1 6 8.9 * 112.2 104 Comments: An asterisk (*) appears next to test results which do NOT meet the project specifications. Services - Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition. Field Test Method:ASTM D2922, ASTM D3017 Gauge ID: 2077 Field Results Reported To: Contractor/Forest Technician: Bryan C. Hughes Report Distribution: //~ H~BC En~ eering//7.' (1) St. Joseph Village, Inc. (1) City of Coppell Engineering ~ ~/ /4 (1)Aguirre Corporation (1) St Andrews Management Reviewed by: tf~,~ (1) Centex - Jobsite (1) St Andrews Management - / Lyndon J. ¢ ~x, P.E. z (1) City of Coppell - Bldg Insp I Principal~ gineer J The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively f~j the use of the client indicated above and shall not be reproduced except in full without the wdtten approval of Terracon. Test results transmitted herein ar( only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 2 of 2 07.s0.~,~7.~,.~