ST0102-CS020827T H ~r . C: I T Y · 0 F August 27, 2002 Rick Fielding Oncor 14400 Josey Lane Farmers Branch, TX 75234 RE: Ruby Road Project # ST01-02 Dear Mr. Fielding: This letter is written as a follow-up to our telephone conversation concerning construction plans for Ruby Road. The plans have been sent to you twice before from Duke Construction most recently on August 12, 2002. With this letter I am providing an additional copy of the construction plans with various components highlighted. I have highlighted the existing overhead lines in yellow and circled the existing power poles in red. I have also highlighted the existing roadway in blue and highlighted the proposed outer limits of the roadway in pink. As can be seen all power poles on the south side (total of 7) need to be relocated. Also, at least two poles on the north side need to be relocated. The timeline for this project is to begin the bidding process in October, award the bid and begin construction prior to the end of this year. It is critical that this road be complete by the early part of 2003 to serve a planned development on the south side of Ruby Road, west of Coppell Road. Please contact me with your proposed timetable when you have had an opportunity to review the enclosed plans. If I can answer any additional questions, please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office 972/304-3686 Fax 972/304-7041 Enclosure