Loading...
SC-Coppell MSW-LR020827FUGRO SOUTH, INC. :S& 1111300 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: August 27, 2002 PROJECT: Coppell Middle School West, Coppell, Texas Project NO.: 0701 -2192 SAMPLE DATE: August 14, 2002 I CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group Inc. CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR ( %) ( ASTM C -231) WATER ADDED (gal): SLUMP (in.) (ASTM C -143) Sidewalk on west end of building TXI CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMS 269 7 8/21/02 102050 3610 4000/28 days CMS 270 28 9/11/02 CMS 271 28 9/11/02 CMS 272 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, C Types of Fracture: E Curing: Methods: ASTM -39 AN B® C D REMARKS: Cylinders cast by Contractor. All information except test data furnished by Contractor and assumed to be correct. Technician: Julio Villarreal FUGRO SOUTH INC. R i awed By: SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Sch ler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahi TXI