Amberpoint BP-CS020423
II T~~~~,E~:~,~~
5001 Spring Valley Road
Suite 600W
Dallas, TX 75244
Phone: 972.774.2500
Fax: 972.991.4247
www.transwestem.net
April 23, 2002
Mr. Ken Griffin
City of Coppell
255 Parkway Boulevard
Coppell, TX 75019
Re: Replacement of 145 sy of failed City ofCoppell street paving - Northpoint Drive
Dear Ken,
As we discussed on Monday, Transwestem has received the attached cost proposal from Glenn
Thurman Company to remove and replace the failed sections of paving in the westbound lane of
Northpoint Drive where it connects to the new section of Northpoint. Thurman's utility work is
nearly complete and they will mobilize within the next week to commence street grading for the
new 2900 If pavement section of North point. As you know Transwestem has committed $1.3M
of public infrastructure costs for the street and utilities at the onset of the project and another
$ lOOK of changes in the plan review by Gary Johnson. We are hoping that the city would see to
repair the bad section of paving at this time so we can open the new business park without visible
failed paving or asphalt patchwork.
I can offer to pick up half of Thurman's "additional move-in" costs up to $3,310. The city has
required us to accommodate uninterrupted and stable drive lanes for traffic to the water tower
facility and baseball field.
Please consider our offer to make repairs while our contractor is mobilized. I would be happy to
discuss how we can proceed with repairs that mutually benefit us both.
Sincerely,
TRANSWESTERN COMMERCIAL SERVICES
AT J I. ---
! \V~
~mb L. Gaspard
Vi~ President
Development Services
cc: Henry Knapek- TCS
Larry Davis - City of Coppell
Your Partner of Choice.
E X h ,. b I'f 8
O~/22/02 12:3S FAX 972 SS7 S096
GLENN THURIIAN III 002
Gii
CHAtlGE oRDER
page1of1
GLENN THURMAN. INC.
P.O. BoxlS!i0842
MellClulte. TeJllllI 75185-0842
1172.286-&333
972-657-!.i096 Fax
This CHANGE ORDER No,
3 (THREE)
Dale:
April 22, 2002
Pr1m11 Connel Change Order No,
3 (THREE)
To: AmberPoinl at Coppell, LLC
A Delaware Iimll8d liability company
By: AmberJtICI< Ltd., an A/1ZOO3 corporation,
Ita managing member
One Stalll Fann P18Z1l
Bloomington, IL 61710
Project: NClI1hPoinI DM & AlIaOl:iII\ll(I Public Utilllies
CllyofCoppell. T_
Original Contrael Amount
Prov!oUB Add1lDnC
PreviOUS Deductions
This Change: Add I (Deduct)
Conlr8el Amount to DIIIll
$1,073,147.17
5106,997,60
50.00
$15,341.25
51,195,486,02
515
]
Pmlect No.
coat Account No.
Vendor No.
Descnptlon of Changes:
Item D_rlpdan Unit Quantity Unit cast Total CoM
Add: ~NIT N . PAVING
REMOVAL & OFFSITE DISPOSA1.. OF EX. CONC PVMT SY 145 $1a.40 '1,943.00
7 INCH 3000 PSI REINF CONe PVMT WITH INT CURB SY 145 $38.85 $5,604.25
CONNECT TO EXIST. PVMT. LF 27 $12.00 1324.00
ADJUST EXIST. SAN. sEWER MANHOLE EA 1 $!.i60.00 $550.00
ADJUST EXIST. WATER VI'J..VE STACK EA 1 1300.00 laoo,oa
MOVE IN FOR ~RA 7" CONC. PVMT, LS 1 $6,620.00 $5,620.00-
Total Add $15,341.26
_ 3"::.'0,00
0.1.: ~
11..o~I)..S
$0,00
Total Deduct
If thie CHANGE ORDER ie iaaued a. a reault of a Prime ContrloCt Chang". thCIlerms of the Prime
Contract Change ara made a part of this CHANGE ORDER.
Please sign and retum to our Me8qulttl OIfiCe, one copy of \his CHANGe OROER.
ACcePTED
GLENN THURMAN, INC.
owner
Matthew Annattong, p,e.
t:stmator
April 22, 2002
By:
Name:
Tille:
Date:
By:
Name:
TlIIe:
Olllll: