Loading...
Amberpoint BP 2-CS020829DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-194R AmberPoint Business Park, zoning change request from PD-194- LI (Planned Development-194-Light Industrial) to PD-194R-LI (Planned Development-194 Revised, Light Industrial) to attach a Detail Site Plan to allow the construction of a 200,000 square-foot office/warehouse with future expansion of 190,000 square feet, on approximately 18 acres of property located at the southwest corner of Sandy Lake Road and Northpoint Drive, at the request of Transwestern Commercial Services. STAFF REP.: Marcie Diamond DRC DATE: August 29, 2002 and September S, 2002 CONTACT: Teresa M. Turner, E.I.T., Graduate Engineer (972)304-3681 COMMENT STATUS: /PRELIMINARY ~A~ nz~B e rrrrn nr~~ Utility Plan 1. Show the location of the water meters and fire vault. 2. The domestic water line serving the building cannot be taken off of the fueline. Show the location of the domestic waterline. 3. A fence is shown on the west side of the property. Is this proposed? If so, a fence cannot be constructed over the 24" waterline. Grading Plan 1. All runoff must be picked up on site. It appears that runoff is being directed to the street at the north driveway. 2. Clearly label the proposed grades at the north driveway.