Loading...
Northlake 635(7)-CS020903T H e C I T T O F COPPELL r o F~ A a , a 9 ENGINEERING DEPARTMENT FAX COVER SHEET P.O. Box 478 256 Parkway Blvd Coppell, TX 75019 Phone: (972)304-3679 Fax: (972)304-7041 7« C. Jack Evans Frwn: Suzan Taylor Fauc 972-235-9544 Dates Sept. 3, 2002 phi; Pagos: 1 (including cover sheet) R.: PSINet Addition Lot 1, block A CC: ^ UrgsM ^For Review ^ Pl~aso Comnsllt ^ Pl~as~ Roply ^ As Roquosbd •Cernmewtss Jack: I talked with Ann Marie Gallery with the TNRCC about the petroleum tanks located at PSlnet. She said that any petroleum storage location that stores more than 1320 gallons of a petroleum product must have a SPCC plan (spill prevention plan) that provides for secondary containment. The SPCC plan must be filed with the EPA. A berm must be constnacted all the way around the tanks that will contain 110°~ capaaty of the largest tank. All water contained within the berm, including rainwater, is considered wastewater and not storm water.. Wastewater is not allowed into the storm sewer system and must be tied into a POTW. PSINet might be able to tie into the storm water system if they pretreat the wastewater with the oiUwater separator and apply for a storm water discharge permit. I am not sure about how a spill would be handled though. I talked with the City's Fire Marshall and he agrees that the oiUwater separator can not be tied into the storm water system. It is my understanding that the tanks need to be registered with the TNRCC. It might be best to have someone from TNRCC look at the site. Shou-d you have any questions please give me a call at 972-304-7019. IFYOUDO NOT RECENEALL OFTHE PAGES PLEASE CALL (972) 304-3679 "Gifu of Coppell Engineering-Excellence By Design"