Loading...
First Assembly-CS020829DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Coppell First Assembly of God, Site Plan, request to allow a 1,558 square foot expansion to the existing 29,488 square -foot church facilities, and the addition of 24 new parking spaces on approximately 6.03 acres of property located at 200 S. Heartz Road, at the request of Rodney Coliver, Coppell First Assembly of God. STAFF REP.: Gary Sieb DRC DATE: August 29, 2002 and September 5, 2002 CONTACT: Teresa M. Turner, E.I.T., Graduate Engineer (972)304 -3681 COMMENT STATUS: ✓PRELIMINARY FINAL REVISED AFTER P &Z The plat and site plan should be changed to correctly reflect that Heartz Road is a 50' right -of- way.