Loading...
SC-Coppell MSW-LR020828FUGRO SOUTH, INC. 2880 virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 520-7328 CLIENT: ~c/n A_K__~S~. ~ ~ Report Date: August 28, 2002 PROJECT: ~oppell Middle School West, Coppell, Texas~s~ Project No.: 0701-2192 SAMPLE DATE: August 15, 2002 I CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group, Inc. 210285 CONCRETE SUPPLIER: TXI 92 PLANT/TRUCK: 27/648 90 MIX ID NUMBER: 9351 12:10 pm AIR (%) (ASTM C-231): 12:45 pm WATER ADDED (gal): 5 Cloudy SLUMP (in.) (ASTM C-143): 4 Paving: Sidewalk on north side of Building A CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMS 273 7 08/22/02 99820 3530 4000/28 days CMS 274 28 09/12/02 CMS 275 28 09/12/02 CMS 276 Hold Fracture mode is (A) unless other'wise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ [~ D Curing: Methods: ASTM C-39 Fracture: A B 6 D REMARKS: Technician: SMH/rm Distribution: Julio Villarreal FUGRO SOUTH INC. Revie~~~ K A Sparks Contractors Inc. - Jim Schooler K A Sparks Contractors Inc.- Jerry Jones (Fax: 972-393-1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell---- Coppell lSD - Mickey Harper SHW Group- Mike Elmore SHW Group - Dale Lilljedahl