SC-Coppell MSW-LR020828FUGRO SOUTH, INC.
2880 virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 520-7328
CLIENT: ~c/n A_K__~S~. ~ ~ Report Date: August 28, 2002
PROJECT: ~oppell Middle School West, Coppell, Texas~s~ Project No.: 0701-2192
SAMPLE DATE: August 15, 2002 I
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. (°F) (ASTM C-1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group, Inc.
210285 CONCRETE SUPPLIER: TXI
92 PLANT/TRUCK: 27/648
90 MIX ID NUMBER: 9351
12:10 pm AIR (%) (ASTM C-231):
12:45 pm WATER ADDED (gal): 5
Cloudy SLUMP (in.) (ASTM C-143): 4
Paving: Sidewalk on north side of Building A
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CMS 273 7 08/22/02 99820 3530 4000/28 days
CMS 274 28 09/12/02
CMS 275 28 09/12/02
CMS 276 Hold
Fracture mode is (A) unless other'wise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ [~ D
Curing: Methods: ASTM C-39 Fracture: A B 6 D
REMARKS:
Technician:
SMH/rm
Distribution:
Julio Villarreal
FUGRO SOUTH INC.
Revie~~~
K A Sparks Contractors Inc. - Jim Schooler
K A Sparks Contractors Inc.- Jerry Jones (Fax: 972-393-1228)
City of Coppell - Lee Stone
City of Coppell - Garreth Campbell----
Coppell lSD - Mickey Harper
SHW Group- Mike Elmore
SHW Group - Dale Lilljedahl