PA9702-LR 990916 MORTAR COMPRESSWE STRENGTH TEST/"N
8901 Carpenter Ft'wy.~ Suite #100
Dallas, Texas 75247
Date of Service: 08/30/1999 Report No.: 9923518 Report Date
09/16/1999
Client No.: COPPELL Project No.: 94991118
Client: CityofCoppell Project: CoppellAquatic/RecreationCtr
Attn: Brad Reid 300 Block &Parkway Blvd
732 DeForest
Coppell TX 750 l 9 Coppell, Texas/Prj. #9605
Services: Obtain samples of mortar from mortar board, identify location of masonry installation for the sample, cast
compressivc strength samples (2" x 2" x 2" cubes).
PROJECT DATA
CONTRACTOR: Hisaw & PtSSOC. MORTAR CLASS: N/A
MORTAR SUPPLIER: N/A PLACEMENTDATE: 08/30/1999 , BATCHTIME: 2:00pm
PLANT: On-site TIME SAMPLED: 2:20pm BY: Del Ratlift
SPECIF{CATION REQUIREMENTS WEATHER CONDITIONS: Hot,clear
STRENGTH: 1800 psi @ 28 Days TEMPERATURE (F) - AIR 98 F MORTAR: 95 F
TRUCK NO: iNI/A TICKET NO:
TEST METHOD: ASTMC109 PLACEMENTLOCATION: EastwallofGymandseereport#9923473for
ASTM C270 technician time
SAMPLE LOCATION: 10' S of NE gym comer course 19
SAMPLE SIZE: 2"X2"X 2"
REPORT OF TESTS
CUBE MAXIMUM COMPRESSIVE
MARKED DATE AGE LOAD STRENGTH
SET NO. TESTED (days) (Ibs. force) (psi)
1 1 09/06/1999 7 5430 1360
1 2 09/27/1999 28
1 3 09/27/1999 28
Technician: Del Ratlift' Started: Finished: ~ Engineering, Inc.
Report Distribution: ~f~ ~
(I) City of Coppell ( 1 ) City of Coppell - Engineering
(1) BrinkIcy Sargent Architects (1) City ofCoppell - Bldg. Insp. Eugene Harbour
(I) Turner Engineers (~) City ofCoppell - Leisure SPry Dept Vice President
(I) Hisaw & Associates
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
08TNIP Page 1 of I