Loading...
PA9702-LR 990916 MORTAR COMPRESSWE STRENGTH TEST/"N 8901 Carpenter Ft'wy.~ Suite #100 Dallas, Texas 75247 Date of Service: 08/30/1999 Report No.: 9923518 Report Date 09/16/1999 Client No.: COPPELL Project No.: 94991118 Client: CityofCoppell Project: CoppellAquatic/RecreationCtr Attn: Brad Reid 300 Block &Parkway Blvd 732 DeForest Coppell TX 750 l 9 Coppell, Texas/Prj. #9605 Services: Obtain samples of mortar from mortar board, identify location of masonry installation for the sample, cast compressivc strength samples (2" x 2" x 2" cubes). PROJECT DATA CONTRACTOR: Hisaw & PtSSOC. MORTAR CLASS: N/A MORTAR SUPPLIER: N/A PLACEMENTDATE: 08/30/1999 , BATCHTIME: 2:00pm PLANT: On-site TIME SAMPLED: 2:20pm BY: Del Ratlift SPECIF{CATION REQUIREMENTS WEATHER CONDITIONS: Hot,clear STRENGTH: 1800 psi @ 28 Days TEMPERATURE (F) - AIR 98 F MORTAR: 95 F TRUCK NO: iNI/A TICKET NO: TEST METHOD: ASTMC109 PLACEMENTLOCATION: EastwallofGymandseereport#9923473for ASTM C270 technician time SAMPLE LOCATION: 10' S of NE gym comer course 19 SAMPLE SIZE: 2"X2"X 2" REPORT OF TESTS CUBE MAXIMUM COMPRESSIVE MARKED DATE AGE LOAD STRENGTH SET NO. TESTED (days) (Ibs. force) (psi) 1 1 09/06/1999 7 5430 1360 1 2 09/27/1999 28 1 3 09/27/1999 28 Technician: Del Ratlift' Started: Finished: ~ Engineering, Inc. Report Distribution: ~f~ ~ (I) City of Coppell ( 1 ) City of Coppell - Engineering (1) BrinkIcy Sargent Architects (1) City ofCoppell - Bldg. Insp. Eugene Harbour (I) Turner Engineers (~) City ofCoppell - Leisure SPry Dept Vice President (I) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 08TNIP Page 1 of I