St Joseph-LR020726REPORT OF IN-PLACE DENSITY TESTING
Report Number: 94021187.0052
Service Date: July 18, 2002
Client: St. Joseph Village, Inc.
Attn: Joseph Dingman
13223 Glad Acres Drive
Dallas TX 75234
ENGIN EERIt'qG
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
(214) 630-1010
Report Date: July 26, 2002
Project: St. Joseph Village
1201 East Sandy Lake Rd
Coppell, TX
Project Number: 94021187
Services:
In-place density testing.
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
in-place density testing. After arriving at the jobsite, HBC's technician did not perform any
in-place density tests because of rain delays and construction documents were not ready for the
water line extension.
Technician: Bryan C. Hughes e~
Report Distribution: D HBC Engine
(1) St. Joseph Village, Inc. (1) City of Coppell Engineering ~.~,~ ~'~
(1) Aguirre Corporation (1) St Andrews Management Reviewed by: , ~
(1) Centex - Jobsite (1) St Andrews Management y' Lyndon J. Cc~, P.E;
(1) City of Coppe,l- Bldg Insp ~ Principal(Engineer
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively f<~tne use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials. Page 1 of 1 ~-~w,,~-~.~.~-,
REPORT OF IN-PLACE DENSITY TESTS
Report Number: 94021187.0053
Service Date: July 19, 2002
EN(~TN E F~rl IXt(3
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
(214) 630-1010
Client: St. Joseph Village, Inc.
Attn: Joseph Dingman
13223 Glad Acres Drive
Dallas TX 75234
Report Date: July 26, 2002
Project: St. Joseph Village
1201 East Sandy Lake Rd
Coppell, TX
Project Number: 94021187
Services: In-place density tests.
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
in-place density tests. After arriving at the jobsite, HBC' s technician was notified that the
plans and specifications for the water line still had not arrived. No in-place density tests were
performed on this date. The 30~inch Force Main Line was also not being worked on per Centex
Construction.
~, LYNBON J. COX
~,,~-..66401 :
,, c
Technician: Bryan C. Hughes
Report Distribution: Z~/~7/~ HBO fi/t~ine
) st. Joseph Village, Inc. (1) City of Coppell Engineering /./7~ .,j/~
(1) Aguirre Corporation (1) St Andrews Managernent Reviewed by: ,.~-..~.~. Lt '
(1) Centex - Jobsite (1) St Andrews Management I~ Lyndon J. ¥ox, P.E.
(1) City of Coppell - Bldg Insp Principatl E[ngineer
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively ~ the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 1
REPORT OF IN-PLACE DENSITY TESTS
Report Number: 94021187.0051
Service Date: July 17, 2002
EN(]INEERIN(]
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
(214) 630-1010
Client: St. Joseph Village, Inc.
Attn: Joseph Dingman
13223 Glad Acres Drive
Dallas TX 75234
Report Date: July 26, 2002
Project: St. Joseph Village
1201 East Sandy Lake Rd
Coppell, TX
Project Number: 94021187
Services:
In-place density tests.
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
in-place density tests. HBC's technician did not take any in-place density tests because the
contractor was not ready for tests on pipe backfill due to rain delays. The contractor had begun
installation of the water line but plans and specifications were not yet available so no backfill
was placed as of yet.
Technician: Bryan C. Hughes
Report Distribution:
(1) St. Joseph Village, Inc.
..-'_ .,x~.x ............ "4 .,¢ %
.- %x..... ~ -..?j- ,,
~.,.,; ...............................
; LYNDON d. COX
.... : ......................... -~.
~,~'.. 6(:>40]
· ,, ~,j-,:'.--.;...
(1) Aguirre Corporation (1) St Andrews Management Reviewed by:
(1) Centex - Jobsit, (1) St Andrews Management 1~ Lyndf)n ~L Cox/C.E.
(1) City of Coppell - Bldg Insp Prir~cip~l Engineer
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusi,~l~ for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 1