St Joseph-LR020726REPORT OF IN-PLACE DENSITY TESTING Report Number: 94021187.0052 Service Date: July 18, 2002 Client: St. Joseph Village, Inc. Attn: Joseph Dingman 13223 Glad Acres Drive Dallas TX 75234 ENGIN EERIt'qG 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: July 26, 2002 Project: St. Joseph Village 1201 East Sandy Lake Rd Coppell, TX Project Number: 94021187 Services: In-place density testing. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for in-place density testing. After arriving at the jobsite, HBC's technician did not perform any in-place density tests because of rain delays and construction documents were not ready for the water line extension. Technician: Bryan C. Hughes e~ Report Distribution: D HBC Engine (1) St. Joseph Village, Inc. (1) City of Coppell Engineering ~.~,~ ~'~ (1) Aguirre Corporation (1) St Andrews Management Reviewed by: , ~ (1) Centex - Jobsite (1) St Andrews Management y' Lyndon J. Cc~, P.E; (1) City of Coppe,l- Bldg Insp ~ Principal(Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively f<~tne use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ~-~w,,~-~.~.~-, REPORT OF IN-PLACE DENSITY TESTS Report Number: 94021187.0053 Service Date: July 19, 2002 EN(~TN E F~rl IXt(3 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: St. Joseph Village, Inc. Attn: Joseph Dingman 13223 Glad Acres Drive Dallas TX 75234 Report Date: July 26, 2002 Project: St. Joseph Village 1201 East Sandy Lake Rd Coppell, TX Project Number: 94021187 Services: In-place density tests. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for in-place density tests. After arriving at the jobsite, HBC' s technician was notified that the plans and specifications for the water line still had not arrived. No in-place density tests were performed on this date. The 30~inch Force Main Line was also not being worked on per Centex Construction. ~, LYNBON J. COX ~,,~-..66401 : ,, c Technician: Bryan C. Hughes Report Distribution: Z~/~7/~ HBO fi/t~ine ) st. Joseph Village, Inc. (1) City of Coppell Engineering /./7~ .,j/~ (1) Aguirre Corporation (1) St Andrews Managernent Reviewed by: ,.~-..~.~. Lt ' (1) Centex - Jobsite (1) St Andrews Management I~ Lyndon J. ¥ox, P.E. (1) City of Coppell - Bldg Insp Principatl E[ngineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively ~ the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 REPORT OF IN-PLACE DENSITY TESTS Report Number: 94021187.0051 Service Date: July 17, 2002 EN(]INEERIN(] 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: St. Joseph Village, Inc. Attn: Joseph Dingman 13223 Glad Acres Drive Dallas TX 75234 Report Date: July 26, 2002 Project: St. Joseph Village 1201 East Sandy Lake Rd Coppell, TX Project Number: 94021187 Services: In-place density tests. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for in-place density tests. HBC's technician did not take any in-place density tests because the contractor was not ready for tests on pipe backfill due to rain delays. The contractor had begun installation of the water line but plans and specifications were not yet available so no backfill was placed as of yet. Technician: Bryan C. Hughes Report Distribution: (1) St. Joseph Village, Inc. ..-'_ .,x~.x ............ "4 .,¢ % .- %x..... ~ -..?j- ,, ~.,.,; ............................... ; LYNDON d. COX .... : ......................... -~. ~,~'.. 6(:>40] · ,, ~,j-,:'.--.;... (1) Aguirre Corporation (1) St Andrews Management Reviewed by: (1) Centex - Jobsit, (1) St Andrews Management 1~ Lyndf)n ~L Cox/C.E. (1) City of Coppell - Bldg Insp Prir~cip~l Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusi,~l~ for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1