Loading...
Grandy's-CS020904 (2)September 4, 2002 Marc 0. Bentley, P.E. Bentley Engineering, Inc. 4125 Broadway Blvd. Suite A250 Garland, TX 75043 RE: Grandy's Addition, Lot 1, Block 1 Construction Plan Review Comments Dear Mr. Bentley: The City of Coppell has reviewed the revised plans for the referenced addition and with the following conditions, the plans will be approved. 1. A letter of approval from the owner of the Boorhem property is required to allow the driveway curb return to extend across the property line. This will need to be submitted prior to construction. 2. Water and irrigation service to the site will be made with a separate tap to the 8" waterline instead of from the 6" fire hydrant connection. The location of the water and irrigation meters shall not be within the fire hydrant easement. Please submit revised copies for the City Engineer's stamp. The City of Coppell requires three sets for its use; your office should submit as many additional sets as necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell. All fees must be paid prior to release of this project for construction. These fees consist of impact and construction inspection fees to be paid to this office. I have included an updated development fee table since the size of the irrigation meter has changed since the original assessment on January 29, 2002. The City also assesses a 2% inspection fee for all private construction and 4% for public installations. If you have any questions, please contact me at your convenience. Sincerely, .!u elao{urtu r Teresa M. Turner, E.I.T. Graduate Engineer Phone: (972) 304 -3681 Fax: (972) 304 -3570 T H E C 1 T Y O F COPPELL 255 PARKWAY P.0.BOX 478 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673 DEVELOPMENT FEE TABLE Project: Grandy's Addition Lot I Blk 1- REVISED Date: September 2,2002 TOTAL FEES DUE AMOUNT DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee (100% due at Issuance of Building Permit) $3,640.00 Water Tap Inspection Fee (100% due at Issuance of Water Meter) $100.00 Water Meter Fee (Domestic) (100% due at Issuance of Water Meter) $142.10 Water Meter Fee (Irrigation/Fireline) (100% due at Issuance of Water Meter) $205.28 Water Meter Deposit (Domestic) (100% due at Issuance of Water Meter) $30.00 Irrigation/Fireline Meter Deposit (100% due at Issuance of Water Meter) $30.00 Wastewater Impact Fee (100% due at Issuance of Building Permit) $1,400.00 Wastewater Tap Inspection Fee (100% due at Issuance of Building Permit) $50.00 Utility Final Inspection Fee (100% due at Issuance of Building Permit) $50.00 Park Fee (100% due prior to Council Approval) $0.00 $0.00 Roadway Impact Fee '(100% due prior to Council Approval) $3,129.67 $3,129.67 Street Light Fee (100% due prior to Acceptance of Project) Information not Available 11 Street Sign Fee (100% due prior to Acceptance of Project) Information not Available 11 Information not Available Construction Inspection Fee (100% due prior to Start of Construction) TOTAL $8,777.05 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $3,129.67 DEVELOPMENT FEE TABLE Project: Grandy's Addition Lot I Blk 1- REVISED Date: September 2,2002 PROJECT: Grandy'sAddition Lot 1 Blk 1 REVISED DATE: September 2,2002 DEVELOPMENT FEE WORKSHEET Water Impact Fee: Domestic Meter(s): 1 1 1/2 inch 5 ESU's Irrigation Meter(s): 1 2 inch 8 ESU's 0 0 ESU's Fireline Meter(s): 0 0 ESU's Total 13 ESU's $280.00 ea. $3,640.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total 2 Connections $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total 1 Domestic Meter(s) $142.10 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation /Fireline Water Meter Fee: Total 1 Irrigation Meter(s) Total 0 Additional Irrigation Meter(s) Total 0 Fireline Meter(s) (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total 1 Meter(s) $30.00 ea. (100% due prior to issuance of water meters) Irrigation /Fire Meter Deposit Fee: Total 1 Meter(s) $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 $280.00 ea. $1,400.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total 1 Connections $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 1 Lots $50.00 ea. (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): Preliminary plat approved: 0 Single-family $0.00 per lot 0 Multifamily $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits Page 1 $205.28 $0.00 $0.00 $100.00 $142.10 $205.28 $0.00 $0.00 $30.00 $30.00 $50.00 $50.00 $0.00 $0.00 Roadway Impact Fee: (See attached fee calculations) $3,129.67 Information not Available the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of -way. (See attached fee calculations if applicable) DEVELOPMENT FEE WORKSHEET Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 Information not Available Information not Available T H E •C 1 T Y •O F COPPELL ENGINEERING DEPARTMENT FAX COVER SHEET To: Marc Bentley From: Teresa Turner Fax: 972 240 -0922 Date: 9/4/2002 Phone: Re: Grandy's Addition Pages: 5 (including cover sheet) CC: P.O. Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304 -3679 Fax: (972)304 -3570 Urgent ❑For Review Please Comment Please Reply As Requested have attached the letter of approval and revised fee assessment table. If you have any questions, please feel free to contact me at 972-304-3681. IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304 -3679 "City of Coppell Engineering— Excellence By Design"