Loading...
Freeport NIP(7.9)-LR020829 (3)RI='E~ ~] I E~ I--Ir~ I I--II~"E~l~lll--I[~i GEOTECHNICAL AND [~ F~ r--i I I F=· ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Uline Facility Freeport Parkway Coppell, Texas REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox REPORT NO. 75 REPORT DATE: 08-29-02 REG PROJECT NO. 9056 DATE OBSERVED: 08-08-02 TECHNICIAN: L. Walton PAGE: 1 of 1 CONTRACTOR: Duke Construction [ Items Observed: ] Pier caps: A.1/9, A.2/9, A.3/9, A.4/9, A.5/9 and A.6/9. [ Reference Plans or Notes Used: ] Sheet S112 r---~There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn-Chandler-Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Ronald F. Reed, P.E. BW/cn 2424STUT[ DR. ,,. SUITE400 ,, DALLAS, TX 75235 · TEL [214] 350 5600 ~. F^X [214] 3500019