Freeport NIP(7.9)-LR020829 (4) GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Uline Facility
Freeport Parkway
Coppell, Texas
REPORTED TO: Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
CONTRACTOR: Duke Construction
I Items Observed:
REPORT NO. 74
REPORT DATE: 08-29-02
REG PROJECT NO. 9056
DATE OBSERVED: 08-07-02
TECHNICIAN: A. Cervantes
PAGE: 1 of 1
J Paving: 0' to 200'S, 10'W to 55'W of N.W. corner and
Panels 16, 17, 18, 19, 36, 37, 38 and 39.
J Reference Plans or Notes Used: J Sheet S.123
JList Deviations Noted:
il) Plastic caps missing on smooth dowles.
2) Panel 16, lifting inserts not tied.
The noted deviations were reported to: Osburn Contractors
[~The noted deviations were corrected.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution:
(1) Duke Realty Corporation/
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1) Pacheco Koch Consulting/
Mr. Jack Evans
(1) Haris Engineering, Inc./
Mr. Ali Haris
(1) Horn-Chandler-Thomas, Inc./
Ms. Diane Coulson
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Ronald F. Reed, P.E.
BW/cn
2424STUTZ DR, · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019