Loading...
Freeport NIP(7.9)-LR020829 (4) GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Uline Facility Freeport Parkway Coppell, Texas REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox CONTRACTOR: Duke Construction I Items Observed: REPORT NO. 74 REPORT DATE: 08-29-02 REG PROJECT NO. 9056 DATE OBSERVED: 08-07-02 TECHNICIAN: A. Cervantes PAGE: 1 of 1 J Paving: 0' to 200'S, 10'W to 55'W of N.W. corner and Panels 16, 17, 18, 19, 36, 37, 38 and 39. J Reference Plans or Notes Used: J Sheet S.123 JList Deviations Noted: il) Plastic caps missing on smooth dowles. 2) Panel 16, lifting inserts not tied. The noted deviations were reported to: Osburn Contractors [~The noted deviations were corrected. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn-Chandler-Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Ronald F. Reed, P.E. BW/cn 2424STUTZ DR, · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019