Freeport NIP(7.9)-LR020828REPORTED TO: Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
CONTRACTOR: Duke Construction
Items Observed:
Reference Plans or Notes Used:
List Deviations Noted:
Panels: 56 -74.
Sheet S.123
The noted deviations were reported to: Raphael Chaivez w /Osburn Contractors
x
The noted deviations were corrected.
Mail
Distribution: (1) Duke Realty Corporation!
Mr. Mike Cox
(1) Duke Realty Corporation!
Mr. Jeff Langston
(1) Pacheco Koch Consulting/
Mr. Jack Evans
(1) Haris Engineering, Inc./
Mr. Ali Haris
(1) Horn Chandler- Thomas, Inc.!
Ms. Diane Coulson
(1) City of Coppell /Mr. Larry Davis
(1) City of Coppell!Mr. Lee Stone
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Uline Facility
Freeport Parkway
Coppell, Texas
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
F=R EEa I EII F=R un
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT NO. 71
REPORT DATE: 08 -28 -02
REG PROJECT NO. 9056
DATE OBSERVED: 08 -02 -02
TECHNICIAN: A. Cervantes
PAGE: 1 of 1
1) Panel 4 and 6: Vertical bars at main door missing.
2) Panels: Lifting inserts are not tied and secured.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Ronald F. Reed, P.E.
BW /cn
G FRDL-I P