Loading...
Gateway BP(1.4)-LR020829Proctor No. ASTM Standard Description Optimum Moisture, Maximum Density, PCF 1 2 D -698 Gray yellowish brown clay w /gravel 22.9 97.1 D -698 Olive brown severely weathered shale 22.6 98.3 REPORT OF FIELD Haverty's In G Gatteway ay and Coppell, REPORTED TO: Catellus Development Corp. 5720 LBJ Freeway, Suite 190 Dallas, Texas 75240 ATTN: Mr. Robert McCann CONTRACTOR: John S. Burns Construction Mail Distribution: (1) Catellus Development Corp./ Mr. Robert McCann (1) City of Coppell /Mr. Larry Davis (1) John S. Burns Construction/ Mr. Rich Kretsch (1) HalffAssociates, Inc.! Mr. Travis Markham �9 r DENSITY TESTS rastructu re Exchange Texas R EEL] I Ef IG I I IEERInG GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT NO. 6 REPORT DATE: 08 -29 -02 REG PROJECT NO. 9256 TECHNICIAN: J. Baradziej PAGE: 1 of 1 12 08 -06 -02 Box Culvert Line A: STA 4 +00 13 Box Culvert Line A: STA 3 +95 14 Box Culvert Line A: STA 3 +90 15 Box Culvert Line A: STA 3 +85 16 Box Culvert Line A: STA 3 +80 17 Box Culvert Line A: STA 3 +80 18 Box Culvert Line A: STA 3 +75 19 Box Culvert Line A: STA 3 +70 20 Box Culvert Line A: STA 3 +65 21 Box Culvert Line A: STA 3 +60 22 Box Culvert Line B: STA 4 +00 23 Box Culvert Line B: STA 3 +95 24 Box Culvert Line B: STA 3 +90 25 Box Culvert Line B: STA 3 +85 26 Box Culvert Line B: STA 3 +80 27 Box Culvert Line B: STA 3 +80 28 Box Culvert Line B: STA 3 +75 29 Box Culvert Line B: STA 3 +70 30 Box Culvert Line B: STA 3 +65 31 Box Culvert Line B: STA 3 +60 6.0 5.3 4.5 3.8 3.0 3.0 2.3 1.5 0.8 0.0 6.0 5.3 4.5 3.8 3.0 3.0 2.3 1.5 0.8 0.0 93.1 93.2 94.3 92.7 92.8 92.4 93.3 93.8 92.7 93.2 93.4 93.9 92.4 92.7 93.6 94.0 93.3 93.1 94.7 94.8 24.3 25.0 25.3 24.7 25.4 26.8 24.9 25.0 24.9 24.2 27.0 26.9 25.6 25.6 24.9 25.5 24.9 26.7 25.2 24.9 95.9 96.0 97.1 95.5 95.6 95.2 96.1 96.6 95.5 96.0 96.2 96.7 95.2 95.5 96.4 96.8 96.1 95.9 97.5 97.6 Test No. Date Location Depth Below Final S. G. (feet) Field Density (pcf) Field Moisture Proctor Compaction ID Level Comments: Where tested, materials were in compliance with project specifications. Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins Manager, CMT BW /cn 77 t 2424 STUTZ D SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 G ROLJ F