Loading...
Northpoint Dr-CS020503T H E C 1 T Y O F C~PPELL r ~~~:: " ''~ ~ o x n s~ t a May 3, 2002 James L. Gaspard, Vice President Transwestern Commercial Services 5001 Spring Valley Road, Suite 600W Dallas, TX 75244 RE: Northpoint Drive Street Repair Dear Mr. Gaspard: The City would like to participate in the removal and replacement of the failed sections of paving on Northpoint Drive. Attached is the revised agreement for the referenced project. Jim Witt was scheduled to be out of town for the rest of the week so we had him sign the agreement prior to sending to you. If you have any questions give me a call, if not please sign and return one original to me. Sincerely, ~~ ~,~-- Kenneth M. Griffin, P.E. _ Director of Engineering/Public Works -n 295 PARKWAY * P. O.BOX 47B * COPPELL T% 75019 * TEL 972/462 0022 * FAX 972/304 3673 EXISTING NORTHPOINT DRIVE PAVING REPAIR AGREEMENT This AGREEMENT is made by and between the City of Coppell, Texas, a Home Rule City (the "CITY"), and AMBERPOINT at COPPELL, L.L.C. a Delaware limited liability company, formerly known as Ballantyne Jack, L.L.C ("APC"). RECITALS WHEREAS, APC wishes to construct Northpoint Drive from Sandy Lake Road to its intersection with existing Northpoint Drive. WHEREAS, APC has entered into an agreement with Glenn Thurman, Inc. to construct the extension of Northpoint Drive WHEREAS, APC has obtained a change order from Glenn Thurman, Inc., as shown in Exhibit A, to make certain paving repairs, of approximately 145 squaze yards, to existing Northpoint Dnve. WHEREAS, the City desires to financially participate with APC, as shown in Exhibit B, in the repair of the existing street failure on Northpoint Drive. NOW THEREFORE, be it resolved that the City will participate in the financial cost of the repair of Northpoint Drive in an amount not to exceed $12,031.25 EXECUTED in duplicate originals this the ~'~~ day of _ ,~~, 2002 CITY OF C P E ,TEXAS By~ Jim tt, City Manager AMBE O Tat Cop 1, L~,C By: ~- 04/22/02 12.35 FAZ 972 557 5096 GLENN T'ELiRMAN C~jOp2 ~i itiLENN TNURMAH, INC. P O Box 850842 Mesquite, TexE~s 7518$-0842 972-286-8333 972-557-5096 Fax CHANGE OitDER This CHANt3E ORDER No. Date= prime Contract Change Order No. To: AmberPoint at Coppell, LLC q Delaware limited liabiiltyy compeny By: AmberJaCk Ltd., an Ar¢ona corporation, Its managing member one state Farm Plaza Bloomington, IL 61710 Project NorthPoint Dti+re B:Associ:IltGd Public Utilities Gi1y of Coppell, Texas original Contract Amount Pervious Additsons Previous DeduGtlons This Change: Add 1 {Deduct} Contract Amount to Date Page 1 of 1 3 (TH17EE) April 22, 2b02 3 (THREE) ~ 1,073,147 17 $106,997.60 50.04 $15,341.25 $1,195,486.02 ---, Pn~ject No. 518 ' CostAccaunt No. Vendor Na. Description of Changes: Rcm Dssclrlptlon Unit Quant)tt- Unit Cost Total Cost Add' UNIT N - PAYING REMOVAL 8 OFFSITE DISPOSAL OF EX. C~NC P1MIT SY 145 $13-40 $1,943.00 71NCH 3000 PSI REINF CaNC PVMT WITH (NT CURB SY 145 $38.65 $5,604.25 CONNECT TO DCIST PVMT. LF 27 Ti12.00 $324.00 ADJUST F~gST SAN. S~fER MANHdLE EA 1 5550.00 $550.00 ADJUST EXIST WATER VALVE STACK EA 1 5300.00 $300.00 MOVE IN FOR EXTRA 7" CONC PVMT. LS 1 $5,820.00 56 620.00- Total Add ;15,347 35 3310,E Delete: ~ 12,031 ~S