Loading...
St Joseph-LR020731FIELD DENSITY TESTING F.eport Number: 94021187.0054 raNcrxr rarNc 8901 Carpenter Frwy., Suite #100 Service Date: July 22 , 2002 Dallas, Texas 75247 (214) 630 -1010 Client: St. Joseph Village, Inc. Report Date: July 31, 2002 Attn: Joseph Dingman Project: St. Joseph Village 13223 Glad Acres Drive 1201 East Sandy Lake Rd Dallas TX 75234 Coppell, TX Proiect Number: 94021187 Material Information Lab Test Data Proiect Requirements Water Dry Unit Dry Unit Test Optimum Max. Lab Water Depth Content Weight Weight Water Dry Unit Content Minimum Dry Material Laboratory (pcf) Content Weight Range Unit Weight No. Test Method Description and Classification (% (pcf) ( %) (% compaction) 1.211870015 ASTM D 698 Dk brown & gray clay 20.9 101.5 -1/ +3 95 2.211870001 ASTM D 698 Med brown silty clay w /gravel 17.6 107.9 -1/ +3 95 Field Test Data Probe Water Dry Unit Dry Unit Test Lift/ Mat. Depth Content Weight Weight No. Test Location Elevation No. (inches) (%) (pcf) (% compaction) 30" Force Water Main Line Backfill @ W Side of Jobsite 599 Sta. 13 +00 7' BEG 2 6 19.5 105.0 97 600 Sta. 13 +50 6' BEG 2 6 20.1 104.7 97 601 Sta. 14 +00 5' BEG 2 6 18.1 106.3 99 602 Sta. 13 +25 4' BEG 2 6 18.0 105.1 97 603 Sta. 13 +50 3' BEG 2 6 17.6 107.5 100 Water Line Backfill, Under Main Building Loop Road 604 20'N & 15'W of SE cor. of Main Bldg. 3' BEG 2 6 16.8 106.7 99 Loop Rd. 605 100'N & 15'W of SE cor. of Main Bldg. 3' BEG 2 6 17.1 106.9 99 Loop Rd. 606 190'N & 15'W of SE cor. of Main Bldg. 3' BEG 2 6 17.5 105.1 97 Loop Rd. Bore Pit Backfill @ SW cor. of Jobsite 607 10' N & 6' E of center of pit 29' BEG 1 6 23.7 96.7 95 608 20' N & 10' E of center of pit 28' BEG 1 6 23.9 96.8 95 Datum: BEG = below existing grade Comments: Test results on this report meet project specification. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 2 07.gp5,RQ,.p K� 09,'05 02 15: 25 - FAX 21 630 7070 HBC ENG 2002 -IELD DENSITY TESTING ]TtC TNEERING :Iient:St. Joseph Village, Inc. Project Number:94021187 Report Number: 94021187.0054 services - Perform in place density and moisture content -tests to determine degree of compaction and material moisture condition. geld Test Method:ASTM D2922, ASTM D3017 auge(D 2077 leid Results Reported To. Contractor /Foreman ^= t7\ � -•• a •- � t '" a . C ' {YNDON J COX ....... �� gy ` �W r r.atnician: Bryan C. Hughes Deport Distribution: SC En ineerin ( 1) 5!. Joseph Village, Inc. (1) City of coppell Engineering 1' Aguirre corporaticn (1) St Andrew Management Reviewed by: i'i Canlcr,- ,Ipbsi:e (1) St .4nd(exs Managcrttent Lyndon J. x, P.E. i) Cur or cocpall - alaq Inap Principe E glnear The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. Thls report is exclusively the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical roatenals_ Page 2 of 2