Freeport NIP(7.9)-LR020903REPORTED TO: Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
CONTRACTOR: Duke Construction
Items Observed:
Reference Plans or Notes Used:
x
There were no deviations noted.
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Uline Facility
Freeport Parkway
Coppell, Texas
Paving: 0 to 150'N, 0 to 100'W from S.W. building corner.
Paving: 0 to 200'S, 0 to 15'W and 0 to 150'w, 0 to 10'S from
N.W. building corner.
Paving: Firelane from N.W. corner of building firelane to N.E. of
building corner.
Sheet C -5
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution: (1) Duke Realty Corporation/
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1) Pacheco Koch Consulting/
Mr. Jack Evans
(1) Haris Engineering, Inc./
Mr. Ali Haris
(1) Horn Chandler- Thomas, Inc./
Ms. Diane Coulson
(1) City of Coppell /Mr. Larry Davis
(1) City of Coppell /Mr. Lee Stone
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT NO. 85
REPORT DATE: 09 -03 -02
REG PROJECT NO. 9056
DATE OBSERVED: 08 -20 -02
TECHNICIAN: A7Chairez
PAGE: 1 of 1
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Ronald F. Reed, P.E.
BW /cn
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
REEL] I EI MEEF411 IG
G LJ
v
rz°
REPORTED TO: Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
CONTRACTOR: Duke Construction
Items Observed:
Reference Plans or Notes Used:
X
There were no deviations noted.
Mail
Distribution: (1) Duke Realty Corporation/
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1) Pacheco Koch Consulting/
Mr. Jack Evans
(1) Haris Engineering, Inc./
Mr. Ali Haris
(1) Horn Chandler- Thomas, Inc./
Ms. Diane Coulson
(1) City of Coppell /Mr. Larry Davis
(1) City of Coppell /Mr. Lee Stone
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Uline Facility
Freeport Parkway
Coppell, Texas
F4E FEE LI EI I
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT NO. 72
REPORT DATE: 09 -03 -02
REG PROJECT NO. 9056
DATE OBSERVED: 08 -05 -02
TECHNICIAN: 17
PAGE: 1 of 1
Paving: 40'S to 385'N, 20 -80'W of of S.W. building corner.
Sheet C -5.0
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Ronald F. Reed, P.E.
BW /je
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
GF=1OLJP