Loading...
CF-Coppell Rd SC-LR020829off, o~.2oaZ Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF LIME DEPTH CHECKS CLIENT: Texas Unified Constructors, Inc. ' DATE: 29 August 2002 J PROJECT: Field Service Offices & Maintenance Facility JOB NO.: 01.1054 Coppell, TX SAMPLES: Taken by Hooper Engineering Laboratories, Inc. on 8/29/02. INDICATED LOCATION LIME DEPTH Suborade @ West Parkino Lot 121 30' north of entry drive 6.0" + 15' west of east curb 131 30' north of entry drive 6.0" + 30' west of east curb c~r~ ~~2~ REQUIRED LIME DEPTH 6.0" + ~~~ ~ ~~ TECHNICIAN: MFM DISTRIBUTION: 131 City of Coppell 111 Vidaud & Associates (1) Doyle Engineering Group 11) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 29 August 2002 PROJECT: Field Service Offices & Maintenance Fac. JOB NO.: 01.1054 Coppell, TX MATERIAL DESCRIPTION: 1- Lime Stabilized Subgrade -Dark Brown Clay with Lime 2) Lime Stabilized Subgrade -Grey Clay with Lime ASTM D 698 STANDARD PROCTOR: 1) 84.0 pcf @ 30.5°k Moisture 21 96.0 pcf @ 23.0°~ Moisture MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION PCF % % Subgrade @ West Parkins Lot 138) 30' north of entry drive, 1 Final 30.7 83.5 15' west of east curb 1391 30' north of entry drive, 2 Final 25.6 94.7 30' west of east curb 99.4 95 + +1% to +3°r6 Of Optimum 98.7 T• /~~•~ TECHNICIAN: MFM DISTRIBUTION: 131 City of Coppell 111 Vidaud & Associates (1) Doyle Engineering Group 111 Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (2y4) 351-5148