Loading...
St Joseph-CS020814AGUIRRE COAPOAATION -72700 PARK CENTRAL DR FLOOR 15 DALLAS TEXAS 75251 FAX 972 788 7583 - ~ - PHONE 972 788 1508 August 14, 2002 Mr. Todd W. Reck, P.E. Engineer Manager City of Irving Water Utili 3000 Rock Island Rd. Irving, TX 75060 ~~ Department Re: City of Irving 54" Line No. 3 Coppell Texas Aguirre Proj. No. 130009900, Task 0400 Dear Mr. Reck: THE CAN-DO SPIRIT TNAT GETS THE JOB DONE aunowc sowrgxs s~xta veo Senders direct dial 972-789-2695 Senders Fax 972-788-1583 m m i l l i ca n@ a g u i rre. co m Enclosed is a copy of the Civil Construction Drawings for Phase 1A of the St. Joseph Village project in Coppell, Texas. These drawings are transmitted to you for your use, and in partial response to your letter to Gary Roden on August 7, 2002. i Please note that on Sheet C2.1, reference is made to adjust the existing control valve manhole, and the separate air relief manhole to accommodate the proposed paving improvements for this project. The details for adjusting these manholes are provided on Sheet C11.1. Sheet C11.1 also shows a proposed reinforced concrete structure to support the proposed 7'x3' single box culvert, Stormwater Line "A", at its crossing of Irving's Water Line No. 3. (See also Sheet C8.8) The original design for this crossing anticipated a clearance of 18" between the outside of the existing water line and the bottom of the proposed box culvert. Field measurements have revealed that there is only 10" of clearance between the water line and the box culvert. However, even with the reduced clearance, the detail we have proposed will provide a void space above the water line, and should not impose any external loading in the water line. We respectfully ask that you review these details, and that if you have any concerns or questions, you please contact Mr. Kurt Koger, P.E. at Aguirre.