Loading...
Community CU-CS020909T H E C 1 T Y O F COPPELL r F ~s_ _ ~ 4 0 X A s ~ a September 9, 2002 David A. Vilbig, P. E. Vilbig & Associates, Inc. 10132 Monroe Drive Dallas, TX 75229 RE: Community Credit Union Construction Plan Comments - 4`h Review Dear Mr. Vilbig: The City of Coppell has reviewed the revised plans for the referenced addition and with the following conditions, the plans will be approved. Condition 1 -Show the location of the Fire Department Connection (FDC) for the building on the Civil Plans. John Sudds, P.E. sent a fax showing the FDC from the MEP's on Friday, September 6`h, and the location was acceptable. Please submit revised copies for the City Engineer's stamp. The City of Coppell requires three sets for its use; your office should submit as many additional sets as necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell. All fees must be paid prior to release of this project for construction. These fees consist of impact and construction inspection fees to be paid to this office as requested in the Fee Assessment Letter dated July 2, 2002. The City assesses a 2% inspection fee for all private construction and 4% for public installations. If you have any questions, please contact me at (972) 304-3681. Sincerely, Teresa M. Turner, E.I.T. Graduate Engineer 255 PARKWAY * P. O.BOX 478 * GOPP ELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673