Loading...
PA9702-LR 990923 TE CONCRETE COMPR L' IVE STRENGTH S 8901 Carpenter Frwy., Suite #100 D~l!!s~ T~as 75247 Date of Service: 08/25/1999 Report No.: 9923105 Report Date 09/23/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway BIrd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. ~9605 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compresslye strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE C~ASS: N/A CONCRETE SUPPLIER: N/A pLACEMENTDATE: 08/25/1999 BATCH TIME: N/A PLANT: N/A TIME SAMPLED: N/A BY: Contractor Made SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: STRENGTH: 0 psi @ 0 Days TEMPERATURE (F) - A:R N/A F CONCRn'E: N/A P SLUMP: N/A TRUCK NO: N/A ~CKWr NO: N/A Am: N/A AIRCONTENT(%): N/A UNrrWEIGHT(pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Contractor made test cylinders prior to HBC's technician arrival and dad not want another ASTM C- 172 set of test cylinders made when HBC'S technician arrived on jobsite for QA. ASTM C-39 SAMPLE LOCATION: N/A REPORT OF TESTS Aco3 a xrvn YAP, US: N/A CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) 0bs. force) (psi) TYPE 1 I N/A 09/01/1999 7 111690 ' ' 3950 1 2 N/A 09/01/1999 7 104500 3700 Average 3830 1 3 N/A 09/22/1999 28 116920 4130 I 4 N/A 09/22/1999 28 122740 4340 Average 4240 Technician: Shane Spinks Started: 9:30am Finished: 1 l:30am ~ n neermg, Inc. (1) City of Coppell (1) City ofCoppelt - Engineering (1) BrinkIcy Sargent Architects (1) City ofCoppell - Bldg. insp. Eugene Harbour (1) TurRet Engineers (1) City of Coppell - Leisure Serv Dcpt Vice President (1) Hisaw & Associates This replm is exclusively for the use of dae client indacated above and shall not be repredueed except in full without dae written approval of HBC Engineering, Inc. 01SS Page I of 1