PA9702-LR 990923 TE
CONCRETE COMPR L' IVE STRENGTH S
8901 Carpenter Frwy., Suite #100
D~l!!s~ T~as 75247
Date of Service: 08/25/1999 Report No.: 9923105 Report Date
09/23/1999
Client No.: COPPELL Project No.: 94991118
Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr
Attn: Brad Reid 300 Block of Parkway BIrd
732 DeForest
Coppell TX 75019 Coppell, Texas/Prj. ~9605
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compresslye strength samples.
PROJECT DATA
CONTRACTOR: Hisaw & Assoc. CONCRETE C~ASS: N/A
CONCRETE SUPPLIER: N/A pLACEMENTDATE: 08/25/1999 BATCH TIME: N/A
PLANT: N/A TIME SAMPLED: N/A BY: Contractor Made
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS:
STRENGTH: 0 psi @ 0 Days TEMPERATURE (F) - A:R N/A F CONCRn'E: N/A P
SLUMP: N/A TRUCK NO: N/A ~CKWr NO: N/A
Am: N/A AIRCONTENT(%): N/A UNrrWEIGHT(pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Contractor made test cylinders prior to HBC's technician arrival and dad not want another
ASTM C- 172 set of test cylinders made when HBC'S technician arrived on jobsite for QA.
ASTM C-39
SAMPLE LOCATION: N/A
REPORT OF TESTS Aco3 a xrvn YAP, US: N/A
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) 0bs. force) (psi) TYPE
1 I N/A 09/01/1999 7 111690 ' ' 3950
1 2 N/A 09/01/1999 7 104500 3700
Average 3830
1 3 N/A 09/22/1999 28 116920 4130
I 4 N/A 09/22/1999 28 122740 4340
Average 4240
Technician: Shane Spinks Started: 9:30am Finished: 1 l:30am ~ n neermg, Inc.
(1) City of Coppell (1) City ofCoppelt - Engineering
(1) BrinkIcy Sargent Architects (1) City ofCoppell - Bldg. insp. Eugene Harbour
(1) TurRet Engineers (1) City of Coppell - Leisure Serv Dcpt Vice President
(1) Hisaw & Associates
This replm is exclusively for the use of dae client indacated above and shall not be repredueed except in full without dae written approval of HBC Engineering, Inc.
01SS Page I of 1