Loading...
Lam Lee-CS020913T H E C 1 T Y O F COPPELL s F X^ b% t 8 4 September 13, 2002 Ken Newman Scott & Reid General Contractors, Inc. 15303 N Dallas Parkway Suite 150 Addison, TX 75001 RE: Second Notification of Repairs /Maintenance Bond Lam Lee Addition Dear Mr. Newman: I met with representatives of the contractor for an inspection of the referenced project on August 19, 2002. Maintenance issues that needed to be addressed prior to the expiration of the maintenance bond were discussed, and an additional site meeting was set for the next week. The contractor representative failed to show up for the subsequent meeting. I request that you please contact me at 972-304-3684 to set up another site meeting. Sincerely, li/ Larry D is Construction Inspector cc: Ken Griffin, Director of Engineering Rhonda Brothers, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official 235 PARKWAY * P. O.BOX 479 * COPPELL T% 73019 * TEL 972/462 0022 * FAX 972/304 3673