Loading...
Lam Lee-CS020916T H E G 1 T Y O F MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Glenn Hollowell, Asst. Director of Public Works From: Larry Davis, Construction Inspector~~~~/~~ Office Phone: (972) 304-3684 Fax: (972) 304-3570 Date: September 16, 2002 RE: Maintenance Bond Walk-thru for Lam Lee Addition A meeting with the contractor for afollow-up maintenance bond walk-thru for paving and utilities on the referenced project has been scheduled for Friday, September 20"' at 9:00 a.m. Please have representatives from Utilities and from Streets attend if possible. Thank you. cc: Ken Griffin, Director of Engineering & Public Works "CITY OF COPPELL ENGINEERING -EXCELLENCE BY DESIGN"