ST0001-CS020625 (2)Suzan RE: Cre ekview Drive
From: "Schnitger, Chris" <cschnitger @sradesign.com>
To: 'Suzan Taylor' < staylor @ci.coppell.tx.us>
Date: 6/25/02 4:15PM
Subject: RE: Creekview Drive
He called yesterday and I talked to him today. I was under the impression
that most of the work that we did on Ruby was going to be removed. It would
be nice to salvage some of our work!
I ran by the site yesterday afternoon to check out the grading that ISI
performed adjacent to the HMAC transition on Freeport. The sloping looks
really good. We might need to adjust it a little once we get the asphalt
down but it looks good so far.
Larry also asked me to look at the wall on the west end. He thought that it
might be leaning a little towards the street. We looked at that yesterday
also and it doesn't appear as though the wall is leaning but it looks like
the cap stones (on top) may have moved a little before the glue dried.
Overall the wall looks really good.
Chris
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649 -3216
(817 649 -7645 FAX
- - - -- Original Message---- -
From: Suzan Taylor [mailto :staylor @ci.coppell.tx.usj
Sent: Tuesday, June 25, 2002 4:10 PM
To: cschnitger @sradesign.com
Subject: Re: Creekview Drive
Thanks
I see you sent Jack Evans a copy of pbase.dwg. We are trying to
salvage the intersection.
>>> "Schnitger, Chris" < cschnitger @sradesign.com> 06/25/02 04:04PM >>>
Suzan,
Here is a copy of the proposed base with the new sidewalk alignment on
it.
Let me know if there is anything else that you are going to need. We
are
going to look at the placement of the sod also and put together a sheet
with
our suggestions.
Chris
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649 -3216
(817 649 -7645 FAX