Loading...
ST0001-CS020913T X E - C 1 T Y O F COPPELL Copp I 19 v Phone: (972)304-3679 Fax: (972)304-7041 T O t R A S l a g ENGINEERING DEPARTMENT FAX COVER SHEET To: Dennis Hammock From Larry Davis Fax: 972- 399 -8228 Date September 13, 2002 Phone: Pages: 5 (including cover sheet) Re: Creekview Drive /Freeport Pkwy. cc: ❑ Urgent ❑For Review ❑ Please Comment ❑ Please Reply ❑ As Requested -Comments: Attached are several concre inspection reports from Rone Engineers. The services were performed during overtime hours and the City will not be responsible for payment. I am unavailable on Thursday, September 19 for a final walk - throuqh. I will be available on Wednesday, September 18 at 9:00 a.m. Please contact me at 972 - 304 -3684 if you have any questions. � IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304 -3679 "City of Coppell Engineering — Excellence By Design" A,.LiH COMPANY 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630 -9745 (214) 630 -9819 (fax) REPORT OF CONCRETE INSPECTION Client: Infrastructure Services, Inc. Report No.: 155871 Attn: Mr. Phillip Bennett Project No.: 026186 PO Box 496448 Date of Service: 07/26/2002 Garland TX 75049 -6448 Report Date: 08/08/2002 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Concrete Inspection Report of Inspection On this date, a Rone Engineers, Inc. representative Inspection. See Report #155344 for results. Technician Ti 5:00 am to 7:00 7 11 ) Page 1 of 1 Technician: Dane Campbell Report Distribution: (I) Infrastructure Services, Inc. (1) City of Coppell (1) City of Coppell (1) City of Coppell of (1) Infrastructure Services, Inc. (1) Schrickel, Rollins & Assoc., Inc. was on site for Concrete S S f0000, LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 99CM Page 1 of 1 A LEIGH COMPANY !, 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630 -9745 (214) 630 -9819 (fax) REPORT OF IN -PLACE DENSITY INSPECTION Client: Infrastructure Services, Inc. Attn: Mr. Phillip Bennett PO Box 496448 Garland TX 75049 -6448 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: In -Place Density Inspection Report No.: 155873 Project No.: 026186 Date of Service: 07/25/2002 Report Date: 09/10/2002 Report of Inspection On this date, a Rone Engineers, Inc. representative was on site to perform an In -Place Density Inspection. See Report 155235 for results. Technician Ti 5:30 am to 6:00 am Page 1 of 1 Technician: Joe Jernigan Report Distribution: (1) Infrastructure Services, Inc. (1) City of Coppell (1) City of Coppell (1) City of Coppell (1) Infrastructure Services, Inc. (1) Schrickel, Rollins & Assoc., Inc. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 99CM Paae 1 of 1 Rone g i n ee rs ® 8908 Ambassador Row Dallas, Texas 752474510 155872 (214) 630 -9745 Project No.: (214) 630 -9819 (fax) PO Box 496448 REPORT OF CONCRETE INSPECTION Client: Infrastructure Services, Inc. Report No.: 155872 Attn: Mr. Phillip Bennett Project No.: 026186 PO Box 496448 Date of Service: 07/25/2002 Garland TX 75049 -6448 Report Date: 09/10/2002 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Concrete Inspection Report of Inspection On this date, a Rone Engineers, Inc. representative(s) was on site to perform a Concrete Inspection. See Report #155226 for results. Technician Time 5 :00 am to 7:00 am Page 1 of 1 Technician: Jon Germer Report Distribution: (1) Infrastructure Services, Inc. (1) City of Coppell (1) City of Coppell (1) City of Coppell (1) Infrastructure Services, Inc. (1) Schrickel, Rollins & Assoc., Inc. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 99CM Pate 1 of 1 Project Manager