Loading...
ST0001-CS020916MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, Director of Engineering & Public Works Glenn Hollowell, Asst. Director of Public Works From: Larry Davis, Construction Inspector 9/48 Office Phone: (972) 304 -3684 Fax: (972) 304 -3570 Date: September 16, 2002 RE: WALK -THRU for Creekview Drive ST 00 -01 A final walk -thru for paving, utilities and drainage on the referenced project has been scheduled for Wednesday, September 18, 2002 at 9:00 a.m. Please let me know if I can be of further assistance. cc: Suzan Taylor, CIP Coordinator Brad Reid, Asst. Director/Parks & Recreation Christian Schnitger, P.E., SRA `/Dennis Hammock, ISI "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"