Freeport NIP(7.9)-LR020822 GEOTECHNICAL AND
ENVIRONHENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Uline Facility
Freeport Parkway
Coppell, Texas
REPORTED TO: Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
REPORT NO. 91
REG PROJECT NO. 9056
SAMPLE DATE: 08-22-02
TECHNICIAN: A. Cervantes
CONTRACTOR: Duke Construction
Location of Sample
Set Number I Location I Quantity Represented
I Firelane: 10'N, 90'E of S.E. building corner 20/580
2 Firelane: 90'N, 72'E of S.E. building corner 120/580
3 Firelane: 160'N, 80'E of S.E. building corner 240/580
4 Firelane: 245'N, 65'E of S.E. building corner 330/580
5 Firelane: 370'N, 95'E of S.E. building corner 450/580
6 Firelane: 420'N, 70'E of S.E. buildin~l corner 540/580
Design Information
Source of Concrete
TXI
Mix Identification J Specified Strength p.s.i.
8273 4000
Test Results
Set Cylinder J Age @ Total Load Compressive I Average
No. ID I Date Tested Test lbs. Strength p.s.i.I Strength p.s.i.
1 2930 08-29-02 7 64130 2270
2930 09-19-02 28 83620 2960
2930 09-19-02 28 82930 2940 2950
2930 10-17-02 56 94860 3360
2931 08-29-02 7 65030 2300
2931 09-19-02 28 79040 2800
2931 09-19-02 28 79670 2820
2931 10-17-02 56 93790 3320
2932 08-29-02 7 71770 2540
2932 09-19-02 28 95120 3370
2932 09-19-02 28 96770 3430
2932 10-17-02 56 111710 3950
2933 08-29-02 7 68260 2420
2933 09-19-02 28 98650 3490
2933 09-19-02 28 100060 3540
2933 10-17-02 56 111180 3940
2810
34O0
3520
2424 STUTZ DE. ,,, SUITE 400 ,, DALLAS, TX 75235 ,~ 'tEL [214] 3505600 · ~AX [214] 3500019
Set Cylinder I Age @ ] Total Load Compressive Average
No. ID I Date Tested Test I lbs. Strength p.s.i. Strength p.s.i.
5 2934 08-29-02 7 Damaged In Field
2934 09-19-02 28 Damaged In Field
2934 09-19-02 28 Damaged In Field
2934 Hold H Damaged In Field
2935 08-29-02 7 Damaged In Field
2935 09-19-02 28 Damaged In Field
2935 09-19-02 28 Damaged In Field
2935 Hold H Damaged In Field
Cylinder Data
Set CylinderI I Time of Concrete Air Ticket
No. D Slump Sample Air Temp. Temp. Entrainment Number
1 2930 5.00 4:10AM 73 78 4.6 N/A
2 2931 4.50 5:50AM 74 81 5.3 N/A
3 2932 4.75 7:10AM 77 85 4.9 N/A
4 2933 5.00 9:12AM 82 86 5.8 N/A
5 2934 4.00 11:50AM 87 92 4.2 N/A
6 2935 5.00 2:05PM 94 95 5.1 N/A
Mail
Distribution: (1) Duke Realty Corporation/
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1) Pacheco Koch Consulting/
Mr. Jack Evans
(1) Haris Engineering, Inc./
Mr. Ali Haris
(1) Horn-Chandler-Thomas, Inc./
Ms. Diane Coulson
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Osburn Contractors/
Mr. Collin LaFsvors
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith Atkins
KEA/je
GEOTECHNICAL AND ~ J==;J r-'"l I I j=~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
~,~i~F Uline Facility
reeport Parkway
Coppell, Texas
REPORTED TO:
Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
A'I-rN: Mr. Mike Cox
CONTRACTOR: Duke Construction
Location of Sample
REPORT NO. 91
REG PROJECT NO. 9056
SAMPLE DATE: 08-22-02
TECHNICIAN: A. Cervantes
Set Number J Location
J Quantity Represented
Firelane: 10'N, 90'E of S.E. building corner 20/580
Firelane: 90'N, 72'E of S.E. building corner 120/580
Firelane: 160'N, 80'E of S.E. building corner 240/580
Firelane: 245'N, 65'E of S.E. building corner 330/580
Firelane: 370'N, 95'E of S.E. building corner 450/580
Firelane: 420'N, 70'E of S.E. building corner 540/580
Design Information
JS°urce °f C°ncrete ITXI Mix Identification 8273 J Specified Strength P's'i' I 4000
Test Results
Set CylinderI Age@ Total Load I Compressive[ Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 2930 08-29-02 7 64130 2270
2930 09-19-02 28
2930 09-19-02 28
2930 Hold H
2 2931 08-29-02 7 65030 2300
2931 09-19-02 28
2931 09-19-02 28
2931 Hold H
3 2932 08-29-02 7 71770 2540
2932 09-19-02 28
2932 09-19-02 28
2932 Hold H
4 2933 08-29-02 7 68260
2933 09-19-02 28
2933 09-19-02 28
2933 Hold H
2424 STUTZ DR. * SUITE 400 * DALLAS, TX 75235 * TEL [214] 350 5600 · FAX [214] 350 0019
SetNo. CylinderlID
5 2934
2934
2934
2934
Age@ Total Load I CompressiveI Average
Date Tested Test lbs.I IStrength p.s.i. Strength p.s.i.
08-29-02 7 Damaged In Field
09-19-02 28 Damaged In Field
09-19-02 28 Damaged In Field
Hold H Damaged In Field
2935 08-29-02 7 Damaged In Field
2935 09-19-02 28 Damaged In Field
2935 09-19-02 28 Damaged In Field
2935 Hold H Damaged In Field
Cylinder Data
Set Cylinder Time of Concrete I Air Ticket
No. ID Slump Sample Air Temp. Temp.I Entrainment Number
1 2930 5.00 4:10AM 73 78 4.6 N/A
2 2931 4.50 5:50AM 74 81 5.3 N/A
3 2932 4.75 7:10AM 77 85 4.9 N/A
4 2933 5.00 9:12AM 82 86 5.8 N/A
5 2934 4.00 11:50AM 87 92 4.2 N/A
6 2935 5.00 2:05PM 94 95 5.1 N/A
Mail
Distribution:
(1) Duke Realty Corporation/
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1) Pacheco Koch Consulting/
Mr. Jack Evans
(1) Haris Engineering, Inc./
Mr. Ali Haris
(1) Horn-Chandler-Thomas, Inc./
Ms. Diane Coulson
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Osburn Contractors/
Mr. Collin LaFavors (concrete
only
Submitted by:
REED ENGINEERING GROUP, INC.
Odginal Signed By
Keith Atkins
KEA/je