Loading...
Gateway BP(2.3)-LR020903Location of Sample Design Information Source of Concrete 1 Test Results Cylinder Data CONCRETE Parking L REPORTED TO: Catellus Development Co 4545 Fuller Drive, Suite 105 Irving, Texas 75038 ATTN: Mr. Robert McCann 1 Quantity Represented Set Number I Location Paving: 20'N, 120'W of N.W. building corner Paving: 40'S, 90'W of N.W. building corner Paving: 95'S, 140'W of N.W. building comer 1 2 3 40/300 120/300 220/300 Mid Cities Mix Identification 7753 1 Specified Strength p.s.i. 4000 Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 1 3155 3155 3155 3155 2 3156 3156 3156 3156 3 3157 3157 3157 3157 09 -10 -02 10 -01 -02 10 -01 -02 Hold 09 -10-02 10 -01 -02 10 -01 -02 Hold 09 -10 -02 10 -01-02 10 -01 -02 Hold 7 28 28 H 7 28 28 H 7 28 28 H 115390 148300 153660 98840 131890 139850 103050 126340 127320 4080 5250 5440 3500 4670 4950 3650 4470 4510 5350 4810 4490 Set No. Cylinder ID Slump Time of Sample Air Temp. Concrete Temp. Air Entrainment Ticket Number 1 2 3 3155 3156 3157 5.25 5.00 6.50 3:20PM 4:10AM 5:25AM 73 79 78 89 90 89 1.6 3.8 3.5 52158 52163 50402 Mail Distribution: (1) Catellus Development Corporation/ Mr. Robert McCann (1) The Wright Group (1) City of Coppell /Mr. Garth Campbell YLINDER TEST REPORT teway One REPORT NO. 68 REG PROJECT NO. 7227 SAMPLE DATE: 09 -03-02 TECHNICIAN: W. Eberhardt Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 REEa I mrimurimmimirtm GEOTECHNICAL AND G R O U P ENVIRONMENTAL CONSULTANTS Location of Sample Design Information Source of Concrete Mid Cities Test Results Cylinder Data CONCR =TE CYLINDER TEST REPORT Parking Lo Addition Gateway One 555 Dividen Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Drive, Suite 105 Irving, Texas 75038 ATTN: Mr. Robert McCann Quantity Represented Set Number I Location Paving: 20'N, 120'W of N.W. building corner Paving: 40'S, 90'W of N.W. building corner Paving: 95'S, 140'W of N.W. building corner 1 2 3 40/300 120/300 220/300 Mix Identification 7753 Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 1 3155 3155 3155 3155 2 3156 3156 3156 3156 3 3157 3157 3157 3157 09 -10 -02 10 -01 -02 10 -01 -02 Hold 09 -10 -02 10 -01 -02 10 -01 -02 Hold 09 -10 -02 10 -01 -02 10 -01 -02 Hold 7 28 28 H 115390 7 98840 28 28 H 7 103050 28 28 H 4080 3500 3650 Set No. Cylinder ID Slump Time of Sample Air Temp. Concrete Temp. Air Entrainment Ticket Number 1 2 3 3155 3156 3157 5.25 5.00 6.50 3:20PM 4:10AM 5:25AM 73 79 78 89 90 89 1.6 3.8 3.5 52158 52163 50402 Mail Distribution: (1) Catellus Development Corporation/ Mr. Robert McCann (1) The Wright Group (1) City of Coppell /Mr. Garth Campbell GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT NO. 68 REG PROJECT NO. 7227 SAMPLE DATE: 09 -03 -02 TECHNICIAN: W. Eberhardt Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je Specified Strength p.s.i. 4000 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 REED Er,c3I r1EERIr7G GROUP