Freeport NIP(7.6)-CS 991118Pacheco Koch 11,01(,
JI
Mr. Michael A. Martin
CITY OF COPPELL
255 Parkway Boulevard
Coppell, Texas 75019
Re: 140 ACRE TRACT
Freeport Parkway Bethel Road
Coppell, Texas
et-dte \I1 -4ae‘
Dear Mr. Martin: �/r`
Transmitted herewith, S re'' Iosed the following
prints for your approv
a N 1 Y C �wA f 7. A
No. s L.�� Ws 1'1
Mr
1 11, "s flo w13 May
1 111
Pi' WIN r64s i Lane)
i friertiSibit 744 t ots
p 1 4- Xiw R 014 immediately.
Jf the enclosures are n� 0. rr
1 e O it 't
Documents attached! r' __,_ort Parkway and
Ruby Road. Please review mese documents and send us any comments you may
have. In addition to the Street Layout Exhibit, please find attached the cost
associated with the installation of a third lane to Freeport Parkway as requested
by your office.
If you have any questions regarding the enclosed items or need any additional
information, please call me at your convenience.
CJE /as
2052 -03
enc.
cc: Paul Brown Duke -Weeks Corporation
November 18, 1999
PK No: 2052 99.198
ENGINEER'S OPINION OF
PROBABLE CONSTRUCTION COST
Project: Cost associated for the third lane in Freeport Parkway
140 Acre Tract- CoppsII, Texas
Prepared By: Pacheco Koch Consulting Engineers
Paving
The quantities and prices shown heron are an indication of the Engineer's opinion
of probable construction cost associated with the referenced project and are NOT
a guarantee or total construction cost.
Sheet 1 of 1
PK No. 2058- 99.198
Date: November 5, 1999
Item
No.
Quantity Unit I Description
Unit
Price
Total
1
2
3
4
7825
7825
106
1
SY
SY
TN
LS
Concrete Paving
Lime Stabilization
Hydrated Lime
Excavation/Grubbing
$36.00
$2.00
$100.00
$10,000.00
Sub -Total
Contingency (20
TOTAL COST
$281,700.00
$15,650.00
$10,600.00
$10,000.00
$317,950.00
$63,590.00
$381,540.00