Loading...
Freeport NIP(7.6)-CS 991118Pacheco Koch 11,01(, JI Mr. Michael A. Martin CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 Re: 140 ACRE TRACT Freeport Parkway Bethel Road Coppell, Texas et-dte \I1 -4ae‘ Dear Mr. Martin: �/r` Transmitted herewith, S re'' Iosed the following prints for your approv a N 1 Y C �wA f 7. A No. s L.�� Ws 1'1 Mr 1 11, "s flo w13 May 1 111 Pi' WIN r64s i Lane) i friertiSibit 744 t ots p 1 4- Xiw R 014 immediately. Jf the enclosures are n� 0. rr 1 e O it 't Documents attached! r' __,_ort Parkway and Ruby Road. Please review mese documents and send us any comments you may have. In addition to the Street Layout Exhibit, please find attached the cost associated with the installation of a third lane to Freeport Parkway as requested by your office. If you have any questions regarding the enclosed items or need any additional information, please call me at your convenience. CJE /as 2052 -03 enc. cc: Paul Brown Duke -Weeks Corporation November 18, 1999 PK No: 2052 99.198 ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST Project: Cost associated for the third lane in Freeport Parkway 140 Acre Tract- CoppsII, Texas Prepared By: Pacheco Koch Consulting Engineers Paving The quantities and prices shown heron are an indication of the Engineer's opinion of probable construction cost associated with the referenced project and are NOT a guarantee or total construction cost. Sheet 1 of 1 PK No. 2058- 99.198 Date: November 5, 1999 Item No. Quantity Unit I Description Unit Price Total 1 2 3 4 7825 7825 106 1 SY SY TN LS Concrete Paving Lime Stabilization Hydrated Lime Excavation/Grubbing $36.00 $2.00 $100.00 $10,000.00 Sub -Total Contingency (20 TOTAL COST $281,700.00 $15,650.00 $10,600.00 $10,000.00 $317,950.00 $63,590.00 $381,540.00