Cottonwood Est-CS020920V"
_ ~ zo1oZ 051821
Date
TE $
Received From
~° °' / as eOTT"
- ~ ~ Address I O0.
~ ~ ~ ,r1 Dollars i
U ~ ~ ~ For r ~ ~ M ~.~ F
.-
O `_~
m m
~aa ~ ~ ~
V ~~
`? N AMi. OF CASH ~ '
- ACCOUNT
U AMT. PAID , CHECK Q
BALANCE MONEY ORDEfl BY
DUE CflEDR CARD
BANK ONE, NA 17 0 3 3
DALLAS, TEXAS 75201
~' TEXAS IRRIGATION SERVICE INC www.bankone.com
3918 ODESSA STREET 32-61/1110 ~' $ZO d ~--'r
DALLAS, TEXAS 75212 d U~ -
(214) 634-8442 f
ORDER OF - / '~~c(~/ d
~~ • •
~~" 1 8
I
~aa
AUTHORIZED SIGNATURE
MEMO i #i~ ~
_ uU~-~ ~ ~ ~I ~~~ ~~
ii'0 i 70 3 iii' is i i 10006 14i:
~-. ~
~~'i827460ii2~i'
DEVELOPMENT FEE TABLE
Project: 100 Cottonwood Drive
Date: 9/20/02
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $1,400.00 ~ G+ ~ 20 0
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $50.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $142.10
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee #N/A #N/A
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
'(100% due prior to Council Approval)
Street Light Fee Information not Availa ble
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Availa ble
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Availa ble
(100% due prior to Start of Construction)
TOTAL #N/A
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL #N/A
DEVELOPMENT FEE WORKSHEET
PROJECT: 100 Cottonwood Drive
DATE: 9/20/02
Water Impact Fee:
Domestic Meter(s): 0 = 0 ESU's
Irrigation Meter(s): 1 - 1 1/2 inch = 5 ESU's
0 = 0 ESU's
Firellne Meter(s): 0 8 inch = 0 ESU's
Total #: 5 ESU's @ $280.00 ea. $1,400.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. $50.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00 $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Firellne Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $142.10 $142.10
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Firellne Meter(s) @ $0.00 $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea. $0.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0 @ $280.00 ea. $0.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
* Preliminary plat approved:
Park Development Zone : Zone 1
0 Single-family @ #N/A per lot #N/A
0 Multi-family @ #N/A per unit #N/A
(50% paid prior to Council approval of final plat)
Page 1