Loading...
Cottonwood Est-CS020920V" _ ~ zo1oZ 051821 Date TE $ Received From ~° °' / as eOTT" - ~ ~ Address I O0. ~ ~ ~ ,r1 Dollars i U ~ ~ ~ For r ~ ~ M ~.~ F .- O `_~ m m ~aa ~ ~ ~ V ~~ `? N AMi. OF CASH ~ ' - ACCOUNT U AMT. PAID , CHECK Q BALANCE MONEY ORDEfl BY DUE CflEDR CARD BANK ONE, NA 17 0 3 3 DALLAS, TEXAS 75201 ~' TEXAS IRRIGATION SERVICE INC www.bankone.com 3918 ODESSA STREET 32-61/1110 ~' $ZO d ~--'r DALLAS, TEXAS 75212 d U~ - (214) 634-8442 f ORDER OF - / '~~c(~/ d ~~ • • ~~" 1 8 I ~aa AUTHORIZED SIGNATURE MEMO i #i~ ~ _ uU~-~ ~ ~ ~I ~~~ ~~ ii'0 i 70 3 iii' is i i 10006 14i: ~-. ~ ~~'i827460ii2~i' DEVELOPMENT FEE TABLE Project: 100 Cottonwood Drive Date: 9/20/02 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $1,400.00 ~ G+ ~ 20 0 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $142.10 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee #N/A #N/A (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 '(100% due prior to Council Approval) Street Light Fee Information not Availa ble (100% due prior to Acceptance of Project) Street Sign Fee Information not Availa ble (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Availa ble (100% due prior to Start of Construction) TOTAL #N/A TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL #N/A DEVELOPMENT FEE WORKSHEET PROJECT: 100 Cottonwood Drive DATE: 9/20/02 Water Impact Fee: Domestic Meter(s): 0 = 0 ESU's Irrigation Meter(s): 1 - 1 1/2 inch = 5 ESU's 0 = 0 ESU's Firellne Meter(s): 0 8 inch = 0 ESU's Total #: 5 ESU's @ $280.00 ea. $1,400.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Firellne Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $142.10 $142.10 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 0 Firellne Meter(s) @ $0.00 $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. $0.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 @ $280.00 ea. $0.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. $0.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. $0.00 (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): * Preliminary plat approved: Park Development Zone : Zone 1 0 Single-family @ #N/A per lot #N/A 0 Multi-family @ #N/A per unit #N/A (50% paid prior to Council approval of final plat) Page 1