Loading...
Coppell Bible-CS020920r H e c i r r o P COPPELL ~r _ ~~ o -~ September 20, 2002 Mike Daniel, P.E. Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite 600 Dallas, TX 75231 RE: Coppell Bible Fellowship Fee Assessment Letter Dear Mr. Daniel Enclosed is a copy of the City of Coppell Development Fee Assessment Table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppe[I in the amount of 2 914.08 and forward the check to the Engineering Department along with a copy of the Fee Assessment Table. This amount is the portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit, The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 732 Deforest Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please feel free to contact me at your convenience. Sincerely, ~r~~~ ~'erzt~sa, Turner_ E.I.T. .u r... -.~_.-,. Graduate Engineer cc: Jennifer Armstrong, Finance Director Mary Beth Spletzer, Admin. Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services 23S PARKWAY # P. 0.80% 478 # COPPE LL TX 73019 # TEL 972/462 0022 # FAX 972/304 3673 DEVELOPMENT FEE TABLE Project: Coppell Bible Fellowship Date: 9~zo/o1 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,340.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $142.10 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $3,215.95 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Inigation/Fireline Meter Deposit $60.00 (i 00% due at Issuance of Water Meter) Wastewater Impact Fee $1,400.00 (I 00% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (I00% due prior to Council Approval) Roadway Impact Fee $2,914.08 $2,914.08 '(I00% due prior to Council Approval) Street Light Fee Information not Availab le (100% due prior to Acceptance of Project) Street Sign Fee Information not Availab le (l00% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL ~ $12,352.13 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $2,914.08 DEVELOPMENT FEE WORKSIiEET PROJECT: Coppell Bible Fellowship DATE: 9/ZO/02 Water Impact Fee: Domestic Meter(s): 1 ~ 1 1/2 inch = 5 ESU's Irrigation Meter(s}: 1 - 2 inch - 8 ESU's 0 - 0 ESU's Fireline Meter(s): 1 • 10 inch - 2.5 ESU's Total #: 15.5 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $142.10 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water ;Vte[er Fee: $4,340.00 $150.00 $142.10 Total #: 1 Irrigation Meter(s) @ $205.28 $205.28 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 1 Fireline Meter(s) @ $3,010.67 $3,010,67 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. $60.00 {100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 @ $280.00 ea. $1,400.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100~Jo due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 {100/, due prior to issuance of building permit) Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 Single•family @ $0.00 per lot $0.00 0 Multi-family @ $0.00 per unit $0.00 (50%, paid prior to Council approval of final plat) Page 1 DEVELOPMENT FEE WORKSHEET (50%, paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T,U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100%, due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right•of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4qo of development cost required for public improvements) $2,914.08 Information not Available Information not Available Information not Available Page 2 ROADWAY IlVIPACT FEE CALCULATIONS PROJECT: Coppell Bible Fellowship DATE: 9/20/02 ROADWAY IMPACT FEE: Service Area * 4 Cate ory ** Institutional Land Use ** Church/Synagogue Building Area (s~ ! 8,680 Development Units ** I8.68 Vehicle Miles er Development Unit ** 0.52 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles er Develo ment Unit) x (Fee er Vehicle Mile) _ $2,914.08 * (Figure 2 -Roadway Impact Fee Study) ** (Table 3 -Roadway Impact Fee Study) *** (Schedule 2, Page 3 -Roadway Impact Fee Study)