Loading...
Town Center L3B3-CS020913T H E G I T Y • O F XSE a:I1 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Lee Stone, Commercial Building Inspector n From: Rick O'Dell, Construction Inspector �,O�, X8 Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 Date: September 13, 2002 RE: Temporary CO for First American Bank A final walk -thru for paving, utilities and drainage on the referenced project has been performed. No deficiencies were found that would interfere with the granting of a temporary Certificate of Occupancy by your department. Please let me know if I can be of further assistance. cc: Ken Griffin, Director of Engineering/Public Works Glenn Hollowell, Asst. Director of Public Works "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"