Loading...
Town Center L3B3-CS020830wwF CH INC. IV NX CONSUL nlva r1VG1NETERS August 30, 2002 Mr. Rick O'Dell City of Coppell 255 Parkway Blvd. Coppeli, Texas 75019 RE: First American Bank Site Coppell, Texas Dear Mr. O'Dell: Welch Engineering, hic. has complied with the requirements of the Texas Department of Licensing and Regulations - Architectural Barriers Section for design of parking, sidewalks and site accessibility outside the building on the aforementioned project. Drawings were submitted and reviewed by Mr. Richard Ferkin of Barrier Free Texas / TAS (BFT Project No. 01138) on February 20, 2002. He will be conducting a final site inspection of the actual improvements sometime in the next several weeks. Any modifications or adjustments necessitated by his review comments will be corrected by the General Contractor for this project. Sincerely, WELCH ENGINEERING, INC. Bruce F. Dunne, P.E. Enclosure 200133 \DC \odelltr cc: Cliff Whisenhunt - First American Bank 4109 Cagle Drive, Suite D • North Richland Hills, TX 76180 • Fax 817 -589 -0990 • Metro 817 -589 -2900 Z coda tt t7 ; ,. a-;zooz 7::d