EARLY GRADING / EXCAVATION PERMIT
IN
RIGHT -OF -WAY / EASEMENT / PRIVATE PROPERTY
Date:
/ -0 -0
[, f Grading plans provided and approved
(Erosion Control must be installed prior to beginning work)
Q Hold Harmless Letter from the Property Owner/Engineer/Developer is attached
Project Name/Location: T /Q ST tl A fe.4r„/ bil -a-Al,
General Contractor: /�VL'O.C/ &W-OV.4 L &CZ eJ
Permit issued to Company/Representative: 4- 7 - A►YaOA/
Address: ?O 8 c Loic.sikWA - 1 -#S- Af hfe, 1etL&4 , T 7
Telephone #: f 6 .2 Emergency Telephone #:
General Description of work (provide copy of approved plans):
9 Cr : Ed'G,4✓,4Tr - W
> Was contact made with City and/or Utility Companies to locate existing utilities?
if NO, Reason: Q YES O
> Is removal of existing street, alleys, or sidewalks necessary? OYES LJ n
if YES, Attach BorelStreet Cut/Saw Cut Permit
> Is Floodplain Permit required? Q YES �NO
if YES, Permit # or date of City Council variance
9
Early 'Gr2dLng / Excavation Permit
Page 2
Representative(s) of the Contractor must adhere to all construction standards approved by the
City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction
requirements (density tests will be required at the applicants expense) and barricading according
to the Texas Manual on Uniform Traffic Control Devices. Areas) affected must be restored to as
good condition as before the commencement of work (grading, drainage, vegetation, and erosion
control).
➢ Any work requiring closing of a lane of traffic, street, or alley must be approved by the
Engineering Dept. with notification to the following prior to closing:
Police Department @ 972 - 304 -3600
Fire Department @ 972 - 304 -3500
Street Department @ 972 - 304 -3546
Engineering Department @ 972 - 304 -3679
Attach barricade plan / trench safety plan of a lane or street closure is required.
Note: Street closures are allowed from 9:00 a.m. until 4:00 P.m. ONLY unless otherwise
anoroved by C %n , Etzzhwer
A 2% inspection fee for grading is required prior to beginning work.
Amount Due: f • e Date Paid: l2' 20 -&1 l
❖ City inspect must be notified 24 hours prior to beginning work related to this permit.
/1� L aE ?
tu �wTK � -20 -o t
Signature ' of Applicant/Contractor Rep. Printed Name Date
Si a[u mAC iry RQ esentative Pri ted Name Date
City Inspeefor for this project
/ �IZ � -/ —,�G cl? z/
Contact Number(s)
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every
claim, demand or cause of action that may be made or come against it by reason of or if any way
arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant
under permit from the City, if such permit is granted
11/30/01 1:46 PM, FROM: 8174859591 TO: +1 (972) 5620009 PAGE: 001 OF 002
R. E. Cupp Construction, L.P. 6646 Industrial Park • Suite C . Ft. Worth, TX 76180
Excavation & Lime Stabilization Office 817- 485 -9588 • Metro 817- 498 -4001 . Fax 817 -485 -9591
Tom Brown
MYCON
208 E. Louisiana, Suite 200
McKinney, Texas 75069 -4312
Phone 972 -529 -2444
Fax 972 -562 -0009
Friday, November 30, 2001
Re: First American Bank REVISED BID
Denton Tapp &: Parkway Blvd.
Coppell, Texas
We propose to furnish labor, materials and equipment on the above referenced project.
WORK TO INCLUDE:
Scope of work includes ADD Alts. A -1, A -2, A -3
Strip stockpile 6" of Topsoil (respread of Topsoil by others)
Strip & Grub
Cut and Fill site
Import Common Fill to bring site to proposed subgrade elevations
Scarify & recompact 6 inches of building pad subgrade
Import 1 ft. of Select Fill for building pad, Select Fill to extend 5 ft. beyond building line
Scarify & recompact 6 inches of S' & 6" paving subgrade
Lime Fire Lane subgrade 6" 7% 32 lbs.
Lime Tonage
Sawcut curb & gutter and dispose of offsite
Add. Alternate A -1 sawcut and remove curb & gutter +1,�0 y�
Add, Alternate A -1 remove concrete paving U' Y
Silt Fence >�
(Construction Entrance with filter fabric>
Respread stockpiled 6" Topsoil
Engineering Layout
FOR THE SUM OF S 47,232.75
EXCLUSIONS: EXPORT POST INJECTED MATERIALS FROM BUILDING OR PAVING AREAS,
SIDEWALK EXCAVATION, LOCATION OF UTILITIES, BARRICADES, ROCK
EXCAVATION, STRUCTURAL EXCAVATION, STRUCTURAL BACK H-L,
TESTING, PERMITS, BONDS, FLAGMEN, POOL F=AVATION, UNDERGROUND
TANK REMOVAL, HAY BALES, SANDBAGS, INLET PROTECTION, REMOVAL �
CAPPING OF UTILITIES, HAZARDOUS MATERIAL REMOVAL, REMOVAL OF
UNKNOWN FOUNDATIONS, GRADE BEAMS, AND TANKS, REMOVAL OF
UNSUITABLE MATERIALS, PROVIDE WATER METER
NOTE Please make this proposal an attachment or exhibit to contract
RE CUPP CONSTRUCTION
Tim Yeager/Estimator
T H E • C 1 T Y • O F
ENGINEERING DEPARTMENT
FAX COVER SHEET
M /C OAI GEN. CZ Al r,
P.O. Box 478
255 Parkway Blvd
Coppell, TX 75019
Phone: (972)304-3679
Fax: (972)904 -3570
To: LEE- SOUPY From: / (WV A A ,D "M&-S
Fax: 912, / 562- 0009 Date:
Phone: Pages: 3 (including cover shee
Re gfft DI NG- AE.M t T CC:
❑ Urgent ❑For Review ❑ Please Comment ❑ Please Reply XAs Requested
*Comments:
6�
aIO2 1Z 1 -CO .
IF YOUDO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304 -3679
"City ofCoppell Engineering - Excellence By Design"