Loading...
Town Center L3B3-PT011220}7 3 • L S 4 Y• a f f j l EARLY GRADING / EXCAVATION PERMIT IN RIGHT -OF -WAY / EASEMENT / PRIVATE PROPERTY Date: / -0 -0 [, f Grading plans provided and approved (Erosion Control must be installed prior to beginning work) Q Hold Harmless Letter from the Property Owner/Engineer/Developer is attached Project Name/Location: T /Q ST tl A fe.4r„/ bil -a-Al, General Contractor: /�VL'O.C/ &W-OV.4 L &CZ eJ Permit issued to Company/Representative: 4- 7 - A►YaOA/ Address: ?O 8 c Loic.sikWA - 1 -#S- Af hfe, 1etL&4 , T 7 Telephone #: f 6 .2 Emergency Telephone #: General Description of work (provide copy of approved plans): 9 Cr : Ed'G,4✓,4Tr - W > Was contact made with City and/or Utility Companies to locate existing utilities? if NO, Reason: Q YES O > Is removal of existing street, alleys, or sidewalks necessary? OYES LJ n if YES, Attach BorelStreet Cut/Saw Cut Permit > Is Floodplain Permit required? Q YES �NO if YES, Permit # or date of City Council variance 9 Early 'Gr2dLng / Excavation Permit Page 2 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests will be required at the applicants expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices. Areas) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). ➢ Any work requiring closing of a lane of traffic, street, or alley must be approved by the Engineering Dept. with notification to the following prior to closing: Police Department @ 972 - 304 -3600 Fire Department @ 972 - 304 -3500 Street Department @ 972 - 304 -3546 Engineering Department @ 972 - 304 -3679 Attach barricade plan / trench safety plan of a lane or street closure is required. Note: Street closures are allowed from 9:00 a.m. until 4:00 P.m. ONLY unless otherwise anoroved by C %n , Etzzhwer A 2% inspection fee for grading is required prior to beginning work. Amount Due: f • e Date Paid: l2' 20 -&1 l ❖ City inspect must be notified 24 hours prior to beginning work related to this permit. /1� L aE ? tu �wTK � -20 -o t Signature ' of Applicant/Contractor Rep. Printed Name Date Si a[u mAC iry RQ esentative Pri ted Name Date City Inspeefor for this project / �IZ � -/ —,�G cl? z/ Contact Number(s) Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted 11/30/01 1:46 PM, FROM: 8174859591 TO: +1 (972) 5620009 PAGE: 001 OF 002 R. E. Cupp Construction, L.P. 6646 Industrial Park • Suite C . Ft. Worth, TX 76180 Excavation & Lime Stabilization Office 817- 485 -9588 • Metro 817- 498 -4001 . Fax 817 -485 -9591 Tom Brown MYCON 208 E. Louisiana, Suite 200 McKinney, Texas 75069 -4312 Phone 972 -529 -2444 Fax 972 -562 -0009 Friday, November 30, 2001 Re: First American Bank REVISED BID Denton Tapp &: Parkway Blvd. Coppell, Texas We propose to furnish labor, materials and equipment on the above referenced project. WORK TO INCLUDE: Scope of work includes ADD Alts. A -1, A -2, A -3 Strip stockpile 6" of Topsoil (respread of Topsoil by others) Strip & Grub Cut and Fill site Import Common Fill to bring site to proposed subgrade elevations Scarify & recompact 6 inches of building pad subgrade Import 1 ft. of Select Fill for building pad, Select Fill to extend 5 ft. beyond building line Scarify & recompact 6 inches of S' & 6" paving subgrade Lime Fire Lane subgrade 6" 7% 32 lbs. Lime Tonage Sawcut curb & gutter and dispose of offsite Add. Alternate A -1 sawcut and remove curb & gutter +1,�0 y� Add, Alternate A -1 remove concrete paving U' Y Silt Fence >� (Construction Entrance with filter fabric> Respread stockpiled 6" Topsoil Engineering Layout FOR THE SUM OF S 47,232.75 EXCLUSIONS: EXPORT POST INJECTED MATERIALS FROM BUILDING OR PAVING AREAS, SIDEWALK EXCAVATION, LOCATION OF UTILITIES, BARRICADES, ROCK EXCAVATION, STRUCTURAL EXCAVATION, STRUCTURAL BACK H-L, TESTING, PERMITS, BONDS, FLAGMEN, POOL F=AVATION, UNDERGROUND TANK REMOVAL, HAY BALES, SANDBAGS, INLET PROTECTION, REMOVAL � CAPPING OF UTILITIES, HAZARDOUS MATERIAL REMOVAL, REMOVAL OF UNKNOWN FOUNDATIONS, GRADE BEAMS, AND TANKS, REMOVAL OF UNSUITABLE MATERIALS, PROVIDE WATER METER NOTE Please make this proposal an attachment or exhibit to contract RE CUPP CONSTRUCTION Tim Yeager/Estimator T H E • C 1 T Y • O F ENGINEERING DEPARTMENT FAX COVER SHEET M /C OAI GEN. CZ Al r, P.O. Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304-3679 Fax: (972)904 -3570 To: LEE- SOUPY From: / (WV A A ,D "M&-S Fax: 912, / 562- 0009 Date: Phone: Pages: 3 (including cover shee Re gfft DI NG- AE.M t T CC: ❑ Urgent ❑For Review ❑ Please Comment ❑ Please Reply XAs Requested *Comments: 6� aIO2 1Z 1 -CO . IF YOUDO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304 -3679 "City ofCoppell Engineering - Excellence By Design"