Loading...
Town Center L3B3-LR020423 GILES ENGINEERING ASSOCIATES, INC. -GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS- DAILY FIELD MONITORING REPORT · 10722 N. Stemmons Freeway, Dallas, TX 75220 / (214) 358-5885 / FAX: (214) 358-5884 [] N8 W22350 Johnson Road Suite Al / Waukesha, WI 53186 / (414) 544-0118 / FAX: (414) 549-5868 [] 11807 North Creek Parkway South, Suite 102, Bothell, WA 98011/206-771-5775/FAX:206-771-5557 [] 8300 Guilford Road, Suite F1 Columbia, MD 21046/410-312-9950/FAX:410-312-9955 [] 4801 Voges Road, Madison, WI 53074/608-838-9708/FAX:608-838-3194 [] 3990 Flowers Road, Suite 530, Atlanta, GA 30360/770-458-3399/FAX: 770-458-3399/FAX: 770-458-3998 CLIENT: Mycon General Contractor PROJECT: 208 East Louisiana Street McKinney, TX 75069 DATE: 4-23-02 WEATHER: Clear PROJECT NO.: FIELD REP.: First American Bank Denton Tap Road & Town Center Drive Coppell, TX 4M-0201003 David Perkins FIELD DENSITY TESTING A Giles Engineering Associates, Inc. (Giles) representative was present at the above referenced site to test compaction of the pavement subgrade. Visual observations indicated material consisting of dark gray lime-treated (Soil ID No. 3). Field density tests were performed by nuclear method to assess the in-place density and moisture content of the material. Test results at random locations indicated compaction of at least 95 percent of the maximum dry density as obtained by the standard proctor method at moisture contents at 24.3 percent (report of field compaction tests is attached). Based on our observations and testing, the test results performed this date were found to be in general accordance with the project specifications. We make no warranty, express or implied, except that our services were performed in accordance with engineering principles generally accepted at this time and in this location. Distribution: Mycon General Contractor, c/o Gene Schaffer; Jack Cumpton; Roger Engineering REVIEWED BY: Randall B. Harvey, ET Manager, Materials Testing Division 4-23-02/ml GILES ENGINEERING ASSOCIATES, INC. 10722 N. Stemmons Freeway, Dallas, Texas 75220/214-358-5885/FAX: 214-358-5884 DAILY FIELD MONITORING REPORT CLIENT: Mycon PROJECT: 208 E. Louisiana Street McKinney, TX 75069 First American Bank Denton Tap Rd. & Town Center Drive Coppell, TX DATE: 4-23-02 PROJECT NO.: 4M-0201003 WEATHER: Clear FIELD REP.: David Perkins TEST DATA Test Test Soil Optimum Max Lab In Place In Place Specified In Place A B C D No Elev ID Moisture Density Moisture Dry Percent Percent ft. % pcf % Density Compaction Compaction pcf 23 FG 3 25.8 92.5 25.8 93.2 95 100.8 X ELEV/DEPTH REF: TEST NO. LOCATION 23 A=Test Results Comply with Specifications B=Density Results Less than Specified C=Moisture not within Specifications D=Test After Recompaction Driveway, Northeast approach FIELD TEST METHOD: [X] Nuclear [ ] Sandcone PROCTOR METHOD [X] Standard [ ] Modified [ ] Drive Tube Reviewed by: Randall B. Harvey, ET // Manager, Materials Testing Division Distribution: Mycon, c/o Gene Schaffer; City of Coppell; Jack Cumpton; Roger Engineering; City of Coppell, c/o Rick O'Dell 4-23-02/ml