DAILY FIELD MONITORING REPORT
· 10722 N. Stemmons Freeway, Dallas, TX 75220 / (214) 358-5885 / FAX: (214) 358-5884
[] N8 W22350 Johnson Road Suite Al / Waukesha, WI 53186 / (414) 544-0118 / FAX: (414) 549-5868
[] 11807 North Creek Parkway South, Suite 102, Bothell, WA 98011/206-771-5775/FAX:206-771-5557
[] 8300 Guilford Road, Suite F1 Columbia, MD 21046/410-312-9950/FAX:410-312-9955
[] 4801 Voges Road, Madison, WI 53074/608-838-9708/FAX:608-838-3194
[] 3990 Flowers Road, Suite 530, Atlanta, GA 30360/770-458-3399/FAX: 770-458-3399/FAX: 770-458-3998
CLIENT: Mycon General Contractor PROJECT:
208 East Louisiana Street
McKinney, TX 75069
DATE: 4-23-02
WEATHER: Clear
PROJECT NO.:
FIELD REP.:
First American Bank
Denton Tap Road & Town Center Drive
Coppell, TX
4M-0201003
David Perkins
FIELD DENSITY TESTING
A Giles Engineering Associates, Inc. (Giles) representative was present at the above referenced site to test
compaction of the pavement subgrade.
Visual observations indicated material consisting of dark gray lime-treated (Soil ID No. 3).
Field density tests were performed by nuclear method to assess the in-place density and moisture content of the
material. Test results at random locations indicated compaction of at least 95 percent of the maximum dry density as
obtained by the standard proctor method at moisture contents at 24.3 percent (report of field compaction tests is
attached).
Based on our observations and testing, the test results performed this date were found to be in general accordance
with the project specifications.
We make no warranty, express or implied, except that our services were performed in accordance with engineering
principles generally accepted at this time and in this location.
Distribution: Mycon General Contractor, c/o Gene Schaffer; Jack Cumpton; Roger Engineering
REVIEWED BY: Randall B. Harvey, ET
Manager, Materials Testing Division
4-23-02/ml
GILES ENGINEERING ASSOCIATES, INC.
10722 N. Stemmons Freeway, Dallas, Texas 75220/214-358-5885/FAX: 214-358-5884
DAILY FIELD MONITORING REPORT
CLIENT: Mycon PROJECT:
208 E. Louisiana Street
McKinney, TX 75069
First American Bank
Denton Tap Rd. & Town Center Drive
Coppell, TX
DATE: 4-23-02 PROJECT NO.: 4M-0201003
WEATHER: Clear FIELD REP.: David Perkins
TEST DATA
Test Test Soil Optimum Max Lab In Place In Place Specified In Place A B C D
No Elev ID Moisture Density Moisture Dry Percent Percent
ft. % pcf % Density Compaction Compaction
pcf
23 FG 3 25.8 92.5 25.8 93.2 95 100.8 X
ELEV/DEPTH REF:
TEST NO. LOCATION
23
A=Test Results Comply with Specifications
B=Density Results Less than Specified
C=Moisture not within Specifications
D=Test After Recompaction
Driveway, Northeast approach
FIELD TEST METHOD: [X] Nuclear [ ] Sandcone
PROCTOR METHOD [X] Standard [ ] Modified
[ ] Drive Tube
Reviewed by: Randall B. Harvey, ET //
Manager, Materials Testing Division
Distribution: Mycon, c/o Gene Schaffer; City of Coppell; Jack Cumpton; Roger Engineering; City of Coppell, c/o
Rick O'Dell
4-23-02/ml