Loading...
Town Center L3B3-LR020410Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONS, IENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Sternmor~s Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: April 10, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-9 FIELD TEST DATA LOCATION OF PLACEMENT: driveway and parking paving 150 ft. south and 50 ft. west of southwest corner of parking lot. DATE CAST: 4/3/02 SUPPLIER: Texas Industries WEATHER: clear TICKET NO.: 3106184 TIME: 9:30 am MIX NO.: 8206 NO. OF CYLINDERS: 5 CEMENT: * SLUMP: 6 inches FLY ASH: * AIR CONTENT: 2.8 % WATER: * UNIT WEIGHT: FINE AGGREGATE: * TEMPERATURE CONCRETE: 68 F COARSE AGGREGATE: * AMBIENT AIR: 54 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: 0gallons ADMIXTURE: * BATCH TIME: 8:55 am FIELD DATA SUBMITTED BY: Rau IX] CYLINDER MADE BY GILES [ ] CYLINDER MADE BY OTHER [X] CYLINDER PICKED UP BY GILES [ ] CYLINDER DELIVERED TO LAB LAB NUMBER: C-002685 DATE RECEIVED: 4/4/02 CYL TYPEO~ AGE ' TEST TOTALLOAD E)[AMET~R ~YLiN~E-I~AREA FRA~TuR~ COMPR~S~J-V~STRENGTH ID CURING (days) DATE (lb-f) (kN) ' (in.) (,sq. ini~ [isq. cra) & CAPPING (psi) (MPa) A 1F/2L 3 4/8/02 91i~0 406 6.000 28.27 182.4 o & N 3225 22.2 B 1F/6L 7 4/10/02 129290 575 6.000 28.27 182.4 D & N 4573 31.5 C 1F/27L 28 5/1/02 D 1F/27L 28 5/1/02 E 1F/-- L HOLD REMARKS: A / CONICAL 1) 2) 3) 4) CONICAL AND SPLIT spECiFiED ~0MPRESsivE sTRENgTH AT 28 DAYS 4000 27.6 28 DAY SPECIMENS NOT YET TESTED I * iNFORMATION NOT SUPPLIED Laboratory ASTM test methods used: C 39, C 617, C 511. Field ASTM test methods used: C31, C 173 or 231, C 138, C 143, C 172, C 1064. moist cure FRACTURE TYPES CONICAL AND SHEAR SHEAR COLUMNAR CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping co,,.~ound Randall B Harvey,ET./ Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX; 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: April 10, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-10 FIELD TEST DATA LOCATION OF PLACEMENT: driveway and parking paving sampled 130 ft. east from southeast corner. DATE CAST: 4/3/02 SUPPLIER: WEATHER: sunny TICKET NO.: TIME: 12:15 pm MIX NO.: NO. OF CYLINDERS: 5 CEMENT: SLUMP: 51/2 inches FLY ASH: AIR CONTENT: 2.4 % WATER: UNIT WEIGHT: * FINE AGGREGATE: TEMPERATURE CONCRETE: 72 F COARSE AGGREGATE: AMBIENT AIR: 58 F #2 COARSE AGGREGATE: WATER ADDED ON SITE: 0gallons ADMIXTURE: BATCH TIME: 11:20 am FIELD DATA SUBMITTED IX] CYLINDER MADE BY GILES [ IX] CYLINDER PICKED UP BY GILES [ LAB NUMBER: C- 002687 CYL! TYPE OF AGE ID CURING (days) A 1F/2L 3 B 1 F/6 L 7 C 1F/27L 28 D 1F/27L 28 E 1 F/-- L HOLD Texas Industries 3106873 8206 BY: Rau ] CYLINDER MADE BY OTHER ] CYLINDER DELIVERED TO LAB DATE RECEIVED: 4/4/02 TEST TOT,~,L LOA6 [Si~r~l~-TE~i Ct;[INbERAREA ~RACTuRE ~OMPRE§~iVI=~TRENGTH DATE ' (lb-f) (kN) (in.) ' (sq. in.) i(sq. om) & CAPPING -(l~si-~ ......(MPa) 4/6/02 109130 485 6000 28.27 182.4 D & N 3860 26.6 4/10/02 133150 592 6.000 28.27 182.4 D & N 4709 32.5 5/1/02 5/1/02 REMARKS: A\ CONICAL SPECiFiEDcoMPREsSIVE STRENGTH AT 28 DAyS 4000 27.6 28 DAY SPECIMENS NOT YET TESTED ~ * INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C31, C 173or231, C 138, C143, C172, C 1064. 3) moist cure 4) c'\ / x CONICAL CONICAL AND AND SPLIT SHEAR FRACTURE TYPES SHEAR COLUMNAR CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping c~-npound Randall B Harvey,ET.~/ Giles Engineering Asso'ciates, Inc. G EOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: April 10, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M-0201003-C-7 FIELD TEST DATA LOCATION OF PLACEMENT: driveway parking paving; southeast corner sampled at 25 ft. east and 25 fi. south. DATE CAST: 4/3/02 SUPPLIER: WEATHER: dear TICKET NO.: TIME: 11:15 am MIX NO.: NO. OF CYLINDERS: 5 CEMENT: SLUMP: 5 inches FLY ASH: AIR CONTENT: 2.2 % WATER: UNIT WEIGHT: * FINE AGGREGATE: TEMPERATURE CONCRETE: 70 F COARSE AGGREGATE: * AMBIENT AIR: 62 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: * ADMIXTURE: * BATCH TIME: 10:25 am FIELD DATA SUBMITTED BY: IX ] CYLINDER MADE BY GILES [ ] ix] LAB NUMBER: CYL TYPE OF ID CURING (days) DATE (Ibd) A 1 Fl2 L 3 4~6~02 103530 B 1 F/6L 7 4/10/02 126570 C 1F/27L 28 5/1102 D 1Ft27L 28 511102 E 1 F/-- L HOLD Texaslndustries 3106320 8206 Rau CYLINDER MADE BY OTHER CYLINDER DELIVERED TO LAB CYLINDER PICKED UP BY GILES [ ] C- 002686 DATE RECEIVED: 4/4/02 A~E TEST TOTAL LOAD DIAMETER:CYLiNDER AREA FRACTURE COMPRESSWE S~:RE~NGTH (kN) (in.) (sq. in.) ' (sq. cm) & CAPPING: (psiS-- iMpa) 461 6.000 28.27 182.4 B & N 3662 25.2 563 6.000 28.27 182.4 D & N 4476 30.9 REMARKS: CONICAL sPEcIFiED COMPRESSIVE sTRENG~T 28 D~s 4000 27.6 28 DAY SPECIMENS NOT YET TESTED ] * INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C31,C 173or231, C 138, C 143, C172, C1064. 3) moist cure 4) CONICAL CONICAL AND AND SPLIT SHEAR FRACTURE TYPES COLUMNAR CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping co~pound Randall B Harvey,ET.//