Loading...
Town Center L3B3-LR020408Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemrnons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: April 08, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-10 FIELD TEST DATA LOCATION OF PLACEMENT: driveway and parking paving sampled 130 ft. east from southeast corner. DATE CAST: 4/3/02 SUPPLIER: Texas Industries WEATHER: sunny TICKET NO.: 3106873 TIME: 12:15 pm MIX NO.: 8206 NO. OF CYLINDERS: 5 CEMENT: * SLUMR: 5 1/2 inches FLY ASH: * AIR CONTENT: 2.4 % WATER: * UNIT WEIGHT: FINE AGGREGATE: * TEMPERATURE CONCRETE: 72 F COARSE AGGREGATE: * AMBIENT AIR: 58 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: 0 gallons ADMIXTURE: * BATCH TIME: 11:20 am FIELD DATA SUBMITTED BY: Rau [X] CYLINDER MADE BY GILES [ ] CYLINDER MADE BY OTHER [X] CYLINDER PICKED UP BY GILES [ ] CYLINDER DELtVERED TO LAB LAB NUMBER: C-002687 DATE RECEIVED: 4/4/02 C~.]- ~ OF~ AGE " TE~-'ITM '-~6¥,~1_ Lb~-I~-~D~--A~qTE~ CYLINDER AREA] FRACTURE ICOMPRESSIVE STRENGTH! ID CURING A 1 F/2 L B 1F/6L C 1F/27L D 1F/27L E 1F/-- L (days) i DATE (lb-f) (kN) : (in.) (sq. in.) , (sq cra) & C~,PRI_N6! _ . (~p_si~)__._~__ (_MPa) 3 4/6/02 109130 485 6.000 28.27 182.4 D & N 3860 26.6 7 4/10/02 28 5/1/02 28 5/1/02 HOLD REMARKS: CONICAL SPECIFIED COMPRESSIVE STRENGTH AT 28 DAYS 28 DAY SPECIMENS NOT YET TESTED 4000 F-- * INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C 31, C 173 or 231, C 138, C 143, C 172, C 1064. 3) moist cure 4) B Cc-- O ~ E FRACTURE ~ ~ / TYPES CONICAL CONICAL AND SHFAR COLUMNAR AND SPLIT SHEAR CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping compound Rand;Il ~ -~rv;y,~T~~ Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St, McKinney, TX DATE: April 08, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-7 FIELD TEST DATA LOCATION OF PLACEMENT: driveway parking paving; southeast corner sampled at 25 ft. east and 25 ft. south. DATE CAST: 4/3~02 SUPPLIER: Texas Industries WEATHER: clear TICKET NO.: 3106320 TIME: 11:15am MIXNO.: 8206 NO. OF CYLINDERS: 5 CEMENT: * SLUMP: 5 inches FLY ASH: * AIR CONTENT: 2.2 % WATER: UNIT WEIGHT: FINE AGGREGATE: * TEMPERATURE CONCRETE: 70 F COARSE AGGREGATE: * AMBIENT AIR: 62 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: * ADMIXTURE: * BATCH TIME: 10:25 am FIELD DATA SUBMITTED BY: Rau IX] CYLINDER MADE BY GILES [ ] CYLINDER MADE BY OTHER ix] LAB NUMBER: ,CYL; TYPE OF ID CURING (days) A 1 F/2 L 3 B 1F/6L 7 C 1F/27L 28 D 1F/27L 28 E 1F/-- L HOLD CYLINDER PICKED UP BY GILES [ ] CYLINDER DELIVERED TO LAB' 6-002686 DATE RECEIVED: 4/4/02 ,~,-GE ~-¥EST TECTAL. ___LOAD I DIAMETER C_Y_L?_NDER AR~_~ FRAC~'URE COMPRESSIVE STRENGTH i DATE (lb-f) (kN) ! (in.) (sq. in.) , (sq. cra) & CAPP NG (psi) ! (MPa) 4/6/02 103530 461 6.000 28.27 182.4 8 & N 3662 25.2 4/10/02 5/1/02 5/1/02 REMARKS: 1) 2) 3) CONICAL 4) CONICAL AND SPLIT SPE(~I-F~D coMPRE~SsIVE STRENGTH ~'r~ ~)~,'~Ts 4000 27.6 28 DAY SPECIMENS NOT YET TESTED I * INFORMATION NOT SUPPLIED Laboratory ASTM test methods used: C 39, C 617, C 511. Field ASTM test methods used: C 31, C 173 or 231, C 138, C 143, C 172, C 1064. moist cure c D E CONICAL AND ~HEAR coLUM'NAR SHEAR FRACTURE TYPES CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping compo?nd Randall B Harvey,l=T,~ Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: April 08, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-9 FIELD TEST DATA LOCATION OF PLACEMENT: driveway and parking paving 150 ft. south and 50 ft. west of southwest corner of parking lot. DATE CAST: 4/3/02 SUPPLIER: Texas Industries WEATHER: clear TICKET NO.: 3106184 TIME: 9:30 am MIX NO.: 8206 NO. OF CYLINDERS: 5 CEMENT: * SLUMP: 6 inches FLY ASH: * AIR CONTENT: 2.8 % WATER: * UNIT WEIGHT: * FINE AGGREGATE: * TEMPERATURE CONCRETE: 68 F COARSE AGGREGATE: * AMBIENT AIR: 54 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: 0gallons ADMIXTURE: BATCH TIME: 8:55 am FIELD DATA SUBMITTED BY: Rau [X] CYLINDER MADE BY GILES [ ] CYLINDER MADE BY OTHER IX] CYLINDER PICKED UP BY GILES [ ] CYLINDER DELIVERED TO LAB LAB NUMBER: C-002685 DATE RECEIVED: 4/4/02 CYL TYPE OF A~E ~ I'EST TOTAL LOAD ~DIAMETERi CYLINDER AREA FRACTuRE--cE~MP~i'~-~r-i:~E-NGTH ID CURING (days) DATE (lb-f) (kN) (in.) (sq. in) :(sq cra) & CAPPING! (psi) i (MPa) A 1F/2L 3 4/6/02 91180 406 8.000 2~.2~ i82.4 C & N' 3~:~5 ........ 22.2 B 1 F/6 L 7 4/10/02 C 1 F/27L 28 5/1/02 D 1 F/27L 28 5/1/02 E 1 F/-- L HOLD I 28 DAY SPECIMENS NOT YET TESTED REMARKS: SPECIFIED C0M-I:;~ESsivE STRENGTH AT 28 DAYS F 4~)00- 27.6 INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C 31, C 173 or 231, C 138, C 143, C 172, C 1064. 3) moist cure 4) A D [ B C ~\ FRACTURE TYPES CONICAL CONICAL CONICAL AND SHEAR COLUMNAR AND SPLIT SHEAR CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping comp~ound Rand;il B Ft~r~;y,~//"