Loading...
Town Center L3B3-LR020403 GILES ENGINEERING ASSOCIATES, INC. -GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS- · 10722 N. Stemmons Freeway, Dallas, TX 75220 / (214) 358-5885 / FAX: (214) 358-5884 N8 W22350 Johnson Road Suite A1 / Waukesha, WI 53186 / (414) 544-0118 / FAX: (414) 549-5868 [] 11807 North Creek Parkway South, Suite 102, Bothell, WA 98011/206-771-5775/FAX:206-771-5557 [] 8300 Guilford Road, Suite F1 Columbia, MD 21046~410-312-9950~FAX:410-312-9955 [] 4801 Voges Road, Madison, Wl 53074/608-838-9708/FAX:608-838-3194 [] 3990 Flowers Road, Suite 530, Atlanta, GA 30360/770-458-3399/FAX: 770-458-3399/FAX: 770-458-3998 DAILY FIELD MONITORING REPORT CLIENT: Mycon PROJECT: 208 E. Louisiana St. McKinney, TX 75069 First American Bank Denton Tap Road & Town Ctr. Drive Coppell, TX DATE: 4-03-02 PROJECT NO.: 4M-0201003 WEATHER: Sunny FIELD REP.: Randy Rau CONCRETE PLACEMENT OBSERVATIONS As requested, a Giles Engineering Associates, Inc. (Giles) representative was present at the above referenced site to observe the placement of concrete, and perform field control tests. Observations indicated 310 cubic yards of Mix No. 8206 concrete was placed this date for the parking lot paving. The concrete was monitored and tested in regards to type, slump, temperature and batch to placement time. 4 sets of 5 concrete cylinders were cast for laboratory strength testing. Prior to the placement of concrete, the placement area was checked for the removal of water, loose soil and unsuitable materials. Based on our observations and field testing, the concrete placed this date appeared to be in accordance with the project specifications. Locations and elevations of tests were assessed in accordance with the accuracy and proximity of provided survey control. Unless otherwise noted, the test locations and elevations were assessed by pacing and hand level methods. We make no warranty, express or implied, except that our services were performed in accordance with engineering principles generally accepted at this time and in this location. Randall B. Harvey,ET J Manager, Materials Testing Division Distribution: Mycon General Contractor, c/o Gene Scaffer; City of Coppell, c/o Tom Cantou 4-03-02/ml GILES ENGINEERING ASSOCIATES, INC. 10722 N. STEMMONS FREEWAY DALLAS, TEXAS 75220 REINFORCING STEEL PLACEMENT EVALUATION CLIENT: Mycon PROJECT NO: 4M-0201003 208 E. Louisiana Street McKinney, TX 75069 PROJECT: First American Bank DATE: 4-03-02 Denton Tap Rd. & Town Ctr. Drive Coppell,TX TECHNICIAN: Randy Rau A representative of Giles visited the above referenced site to observe and evaluate the reinforcing steel placement at the following locations: Firelane driveway parking paving from SW comer slab 50' West to 200' South - 25' South to 150' East, then 75' North No discrepancies were noted Locations and elevations of tests were assessed in accordance with the accuracy and proximity of provided survey control. Unless otherwise noted, the test locations and elevations were assessed by pacing and hand level methods. We make no warranty, express or implied, except that our services were perfomied in accordance with engineering principles generally accepted at this time and in this location. Distribution: Mycon General Construction, c/o Gene Scaf£er; City of Coppell REVIEWED BY: Randall B. Harvey, ET Manager, Materials Testing Division j 4-03-02