Town Center L3B3-LR020325 GILES ENGINEERING ASSOCIATES, INC.
-GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS-
10722 N. Stemmons Freeway, Dallas, TX 75220 / (214) 358-5885 / FAX: (214) 358-5884
CLIENT: Mycon General Contractor PROJECT:
208 E. Louisiana Street
McKinney, TX 75069
DATE: 3-25-02
First American Bank
Denton Tap Rd & Town Center Drive
Coppell, TX
PROJECT NO.: 4M-0201003
FIELD REP.: Randy Rau
LIME GRADATION RESULTS
SAMPLE NO. SAMPLE WT. % PASSING ON % PASSING #4 PASS/FAIL
LBS. 1 3/4" SIEVE
SIEVE
1 10# 100 75 Pass
2 10# 100 75 Pass
3 10# 100 70 Pass
4 10# 100 65 Pass
5 10# 100 80 Pass
Location: First American Bank - Coppell
SAMPLE NO. LOCATION
1 Firelane entrance, 75' West
2 Firelane entrance, 125' West
3 West/South drive from shopping center entrance, 100' North
4 West/South drive from shopping center entrance, 75' North
5 West/South drive from shopping center entrance, 50' North
We make no warranty, express or implied, except that our services were performed in accordance with engineering
principles generally accepted at this time and in this location.
Distribution: Mycon, c/o Gene Schaffer; City of Coppell, c/o Rick O'Dell; Jack Cumpton; Roger Engineering
REVIEWED BY: Randall B. Harvey, ET"'
Manager, Materials Testing Division
3-25-02/ml