Loading...
Town Center L3B3-LR020325 GILES ENGINEERING ASSOCIATES, INC. -GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS- 10722 N. Stemmons Freeway, Dallas, TX 75220 / (214) 358-5885 / FAX: (214) 358-5884 CLIENT: Mycon General Contractor PROJECT: 208 E. Louisiana Street McKinney, TX 75069 DATE: 3-25-02 First American Bank Denton Tap Rd & Town Center Drive Coppell, TX PROJECT NO.: 4M-0201003 FIELD REP.: Randy Rau LIME GRADATION RESULTS SAMPLE NO. SAMPLE WT. % PASSING ON % PASSING #4 PASS/FAIL LBS. 1 3/4" SIEVE SIEVE 1 10# 100 75 Pass 2 10# 100 75 Pass 3 10# 100 70 Pass 4 10# 100 65 Pass 5 10# 100 80 Pass Location: First American Bank - Coppell SAMPLE NO. LOCATION 1 Firelane entrance, 75' West 2 Firelane entrance, 125' West 3 West/South drive from shopping center entrance, 100' North 4 West/South drive from shopping center entrance, 75' North 5 West/South drive from shopping center entrance, 50' North We make no warranty, express or implied, except that our services were performed in accordance with engineering principles generally accepted at this time and in this location. Distribution: Mycon, c/o Gene Schaffer; City of Coppell, c/o Rick O'Dell; Jack Cumpton; Roger Engineering REVIEWED BY: Randall B. Harvey, ET"' Manager, Materials Testing Division 3-25-02/ml