Loading...
Town Center L3B3-LR020308 GILES ENGINEERING ASSOCIATES, INC. -GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS- DAILY FIELD MONITORING REPORT · 10722 N. Sternmons Freeway, Dallas, TX 75220 / (214) 358-5885 / FAX: (214) 358-5884 N8 W22350 Johnson Road Suite A1 / Waukesha, WI 53186 / (414) 544-0118 / FAX: (414) 549-5868 [] 11807 North Creek Parkway South, Suite 102, Bothell, WA 98011/206-771-5775/FAX:206-771-5557 8300 Guilford Road, Suite F1 Columbia, MD 21046/410-312-9950/FAX:410-312-9955 4801 Voges Road, Madison, WI 53074/608-838-9708/FAX:608-838-3194 121 3990 Flowers Road, Suite 530, Atlanta, GA 30360/770-458-3399/FAX: 770-458-3399/FAX: 770-458-3998 CLIENT: Mycon General Contractor PROJECT: 208 East Louisiana Street McKinney, TX 75069 DATE: 3-08-02 WEATHER: Cloudy PROJECT NO.: FIELD REP.: First American Bank Denton Tap Road & Town Center Drive Coppell, TX 4M-0201003 Robe~Duncan, AET FIELD DENSITY TESTING A Giles Engineering Associates, Inc. (Giles) representative was present at the above referenced site to test compaction of the trench backfill. Visual observations indicated material consisting of dark brown sandy clay (Soil ID No. 2 ). Field density tests were performed by nuclear method to assess the in-place density and moisture content of the material. Test results at random locations indicated compaction of at least 95. I percent of the maximum dry density as obtained by the standard proctor method at moisture contents of 17.1 percent (report of field compaction tests is attached). Based on our observations and testing, the test results performed this date were found to be in general accordance with the project specifications. We make no warranty, express or implied, except that our services were performed in accordance with engineering principles generally accepted at this time and in this location. Distribution: Mycon General Contractor, c/o Gene Schaffer; Jack Cumpton; Roger Engineering REVIEWED BY: Randall B. Harvey, ET ~ Manager, Materials Testing Division 3-08-02/ml GILES ENGINEERING ASSOCIATES, INC. N 10722 N. Stemmons Freeway, Dallas, Texas 75220/214-358-5885/FAX: 214-358-5884 DAILY FIELD MONITORING REPORT CLIENT: Mycon PROJECT: 208 E. Louisiana Street McKinnry, TX 75069 DATE: 3-08-02 WEATHER: Cloudy PROJECT NO.: FIELD REP.: First American Bank Denton Tap Rd. & Town Center Drive Coppell, TX 4M-0201003 Robert Duncan, AET TEST DATA Test Test Soil Optimum Max Lab In Place In Place Specified In Place A B C D No Elev ID Moisture Density Moisture Dry Percent Percent ft. % pcf % Density Compaction Compaction pcf 15 Grade 2 19.8 105.7 17.1 101.5 95 95.1 X ELEV/DEPTH REF: TEST NO. LOCATION A=Test Results Comply with Specifications B=Density Results Less than Specified C=Moisture not within Specifications D=Test After Recompaction L 15 ] 2" domestic water line at 5' East of Northeast building comer FIELD TEST METHOD: [X] Nuclear [ ] Sandcone PROCTOR METHOD [X] Standard [ ] Modified [ ] Drive Tube Reviewed by: Randall B. Harvey, ET ~ Manager, Materials Testing Division Distribution: Mycon, c/o Gene Schaffer; City of Coppell; Jack Cumpton; Roger Engineering 3-08~02/ml Moisture/Density Relationship ASTM D-698 120 119 118 117 116 115 114 113 112 111 110 109 108 107 106 105 104 103 102 101 lO0 9.0 Maximum Dry Density (pcf) ~ ~ 4 Soil Light brown clayey sand Classification LL=28 PL=22 PI=6 % Passing -200 Seive= 27.2 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17,0 18.0 19,0 20.0 21.0 Moisture Content (%) MOISTURE-DENSITY RELATIONSHIP First American Bank Coppell, TX Project No. 4M-0201003 ~