Loading...
Town Center L3B3-LR020221GILES ENGINEERING ASSOCIATES, INC. -GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS- DALLY FIELD MONITORING REPORT · 10722 N. Stemmons Freeway, Dallas, TX 75220 / (214) 358-5885 / FAX: (214) 358-5884 N8 W22350 Johnson Road Suite A1 / Wankesha, WI 53186 / (414) 544-0118 / FAX: (414) 549-5868 [] 11807 North Creek Parkway South, Suite 102, BothelL WA 98011/206-771-5775/FAX:206-771-5557 8300 Guilford Road, Suite F1 Columbia, MD 21046/410-312-9950/FAX:410-312-9955 [] 4801 Voges Road, Madison, WI 53074/608-838-9708/FAX:608-838-3194 [] 3990 Flowers Road, Suite 530, Atlanta, GA 30360/770-458-3399/FAX: 770-458-3399/FAX: 770--458-3998 CLIENT: Mycon General Contractor PROJECT: 208 East Louisiana Street McKinney, TX 75069 DATE: 2-21-02 WEATHER: Clear PROJECT NO.: FIELD REP.: First American Bank Denton Tap Road & Town Center Drive Coppell, TX 4M-0201003 Andrew Gon×ales FIELD DENSITY TESTING A Giles Engineering Associates, Inc. (Giles) representative was present at the above referenced site to test compaction of the trench backfill. Visual observations indicated material consisting of dark brown sandy clay(Soil ID No. 2). Field density tests were performed by nuclear method to assess the in-place density and moisture content of the material. Test results at random locations indicated compaction of at least 97.5 percent of the maximum dry density as obtained by the standard proctor method at moisture contents ranging from 20.1-22.3 percent (report of field compaction tests is attached). Based on our observations and testing, the test results performed this date were found to be in general accordance with the project specifications. We make no warranty, express or implied, except that our services were performed in accordance with engineering principles generally accepted at this time and in this location. Distribution: Mycon General Contractor, c/o Gene Schaffer; Jack Cumpton; Roger Engineering REVIEWED BY: Randall B. Harvey, ET ~ Manager, Materials Testing Division 2-21-02/ml Moisture/Density Relationship ASTM D-698 110.0 109.0 108.0 107.0 106.0 105.0 104.0 103,0 102.0 101.0 100.0 99.0 98.0 · 97.0 · 96.0 95.0 94.0 93.0 · 92.0 · 91.0 90.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0 23,0 24,0 25.0 Moisture Content (%) MOISTURE-DENSITY RELATIONSHIP First American Bank Coppell, TX Project No. 4M-0201003 j GILES ENGINEERING ASSOCIATES, INC. "10722 N. Stemmoas Freeway, Dallaa, Texas 75220/214-358-$885/FAX: 214-358-5884 DAILY FIELD MONITORING REPORT CLIENT: Mycon PROJECT: 208 E. Louisiana Street McKinney, TX 75069 DATE: 2-21-02 WEATHER: Clear PROJECT NO.: FIELD REP.: First American Bank Denton Tap Rd. & Town Center Drive Coppell, TX 4M-0201003 Andrew Gonzales TEST DATA Test Test Soil Optimum Max Lab In Place In Place Specified In Place A B C D No Elev ID Moisture Density Moisture Dry Percent Percent ft. % pcf % Density Compaction Compaction pcf 8 RFG 2 19.8 105.7 20.1 104.7 95 99.1 X 9 -2'RFG 2 19.8 105.7 22.3 103.7 95 98.1 X 10 RFG 2 19.8 105.7 22.2 103.2 95 97.6 X X 11 RFG 2 19.8 105.7 22.3 103.1 95 97.5 X X ELEV/DEPTH REF: A=Test Results Comply with Specifications B=Density Results Less than Specified C=Moisture not within Specifications D=Test After Recompaction TEST NO. LOCATION 8 Trench at manhole connection along entrance parking lot 9 Trench at manhole connection along entrance parking lot 10 Trench backfill at plumbing at Northeast comer of building 11 Trench backfill at plumbing at Northeast comer of building FIELD TEST METHOD: [X] Nuclear PROCTOR METHOD IX] Standard [ ] Sandcone [ ] Modified Reviewed by: [ ] Drive Tube Randall B. Harvey, ET Manager, Materials Testing Division Distribution: Mycon, c/o Gene Schaffer; City of Coppell; Jack Cumpton; Roger Engineering 2-21-02