Loading...
Town Center L3B3-LR020712Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: July 12, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-20 FIELD TEST DATA LOCATION OF PLACEMENT: Sidewalks at 10 ft. east of northwest corner of property. DATE CAST: 6/13/02 SUPPLIER: WEATHER: clear TICKET NO.: TIME: 1:45 pm MIX NO.: NO. OF CYLINDERS: 4 CEMENT: SLUMP: 4 3/4 inches FLY ASH: AIR CONTENT: 2 % WATER: UNIT WEIGHT: * FINE AGGREGATE: TEMPERATURE CONCRETE: 86 F COARSE AGGREGATE: AMBIENT AIR: 92 F #2 COARSE AGGREGATE: WATER ADDED ON SITE: 0 gallons ADMIXTURE: BATCH TIME: 12:08 pm FIELD DATA SUBMITTED ix] IX] LAB NUMBER: !C'~] TYPE OF ID CURING A 1F/CL B 1F/27L C 1F/27L D 1F/-- L CYLINDER CYLINDER C-003158 MADE BY GILES [ PICKED UP BY GILES [ AGE TEST (days) DATE 7 6/20/02 28 7/11/02 28 7/1 1/02 HOLD TXI 3148299 9783 BY: Wheeler ] CYLINDER MADE BY OTHER ] CYLINDER DELIVERED TO LAB DATE RECEIVED: 6/14/02 TOTAL LOAD i DIAMETER! CYL NDER AREA iFRACTURE COMPRESSIVE STRENGTHi (Ib-~ (kN) ; (in.) (sq. in.) i(sq. cm) ~& CAPPING ~ ----(MPa) : 99560 443 6.000 28,27 182.4 C & N 3521 24.3 120100 534 6.000 28.27 182.4 D & N 4248 29.3 146270 651 6.000 28.27 182.4 D & N 5173 35.7 ...... SPECIFIED C0~IPRESSIVE STRENGTH AT 28 DAYS 3500 24.1 COMPLY WITH SPECIFICATION J * INFORMATION NOT SUPPLIED TEST RESULTS 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C 31, C 173 or 231, C 138, C 143, C 172, C 1064. 3) Moist cure 4) c D ~ E FRACTURE CAPPING METHODS N = neoprene pads TYPES S = sulfur capping compound ~ P = gypsum capping compound CONICAL CONICAL AND SH~R COLUMNAR AND SPLIT SHEAR Rand II B REMARKS: CONICAL Giles Engineering Associates, Inc. G EOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE; July 12, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-20 FIELD TEST DATA LOCATION OF PLACEMENT: Sidewalks at 10 ft. east of northwest corner of property. DATE CAST: 6/13/02 WEATHER: clear TIME: 1:45 pm NO. OF CYLINDERS: 4 SLUMP: 4 3/4 inches AIR CONTENT: 2 % UNIT WEIGHT: * TEMPERATURE CONCRETE: 86 F AMBIENT AIR: 92 F WATER ADDED ON SITE: 0 gallons BATCH TIME: 12:08 pm IX] CYLINDER MADE BY GILES ix] LAB NUMBER: CYL TYPE OF ID CURING B 1F/27L C 1FI27L SUPPLIER: TXI TICKET NO.: 3148299 MIX NO.: 9783 CEMENT: * FLY ASH: * WATER: * FINE AGGREGATE: * COARSE AGGREGATE: * #2 COARSE AGGREGATE: * ADMIXTURE: * FIELD DATA SUBMITTED BY: Wheeler ] CYLINDER MADE BY OTHER CYLINDER PICKED UP BY GILES [ ] CYLINDER DELIVERED TO LAB C- 003158 DATE RECEIVED: 6114102 AGE ~-ES'l:- - ToT~L~OAD -D-IAMETE~i~YLIN~ER,~,R~; FRA-~TuR~icO~PRESSI~'S~R~NGTH (days) DATE (lb-f) (kN) (in.) (sq. in.) (~qT~i-~ & CApP[?G _(p~si!_ ~__. (_M_Pa) 7 6/2~')-02 ~560 443 6.000 28.27 182.4 C & N 3521 24.3 28 7/11/02 120100 534 6.000 28.27 182.4 D & N 4248 29.3 28 7/11/02 146270 651 6.000 28.27 182.4 D & N 5173 35.7 HOLD REMARKS: CONICAL CONICAL CONICAL AND AND SPLIT SHEAR S~Eci~D~OMPRESsivE STREN~-r~AT'28 D~,~'S 350-0 ' ~ -~4.1 COMPLY WITH SPECIFICATION I * INFORMATION NOT SUPPLIED TEST RESULTS 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C 31, C 173 or 231, C 138, C 143, C 172, C 1064. 3) Moist cure 4) D ~ E FRACTURE CAPPING METHODS TYPES N = neoprene pads S = sulfur capping compound P = gypsum capping compound COLUMN,~R SHEAR Randall B Harvey'ET./