Loading...
Town Center L3B3-LR020621Giles Engineering Associates, Inc. GEOTECHN1CAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: June 21,2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-20 FIELD TEST DATA LOCATION OF PLACEMENT: Sidewalks at 10 ft. east of northwest corner of property. DATE CAST: 6/13/02 SUPPLIER: WEATHER: clear TICKET NO.: TIME: 1:45pm MIX NO.: NO. OF CYLINDERS: 4 CEMENT: SLUMP: 43/4 inches FLY ASH: AIR CONTENT: 2 % WATER: UNIT WEIGHT: * FINE AGGREGATE: TEMPERATURE CONCRETE: 86 F COARSE AGGREGATE: AMBIENT AIR: 92 F #2 COARSE AGGREGATE: WATER ADDED ON SITE: 0 gallons ADMIXTURE: BATCH TIME: 12:08 pm FIELD DATA SUBMITTED IX ] CYLINDER MADE BY GILES [ IX ] CYLINDER PICKED UP BY GILES [ LAB NUMBER: C-003158 CYL TYPE OF ID CURING A 1 F/6L B 1 F/27L C 1F/27L D 1F/-- L 3148299 9783 BY: Wheeler ] CYLINDER MADE BY OTHER ] CYLINDER DELIVERED TO LAB DATE RECEIVED: 6/14/02 AGE TEST 'TOTAL LOAD 'DIAMETER ~YLIND~F~ AREA FRACTURE COMPRESSIVE STRENGTH (days) DATE (Ih-f) (~N~ (in.) i~c~i in~) ~sq. ~r~i & CAPPING (psi) (MPa) 7 6/20/02 99~C) '4~43 6.000 --28.27:18:2.~ C & N 3521 24.3 28 7/11/02 28 7/11/02 HOLD REMARKS: SpECIFieD CoMPRESsIvE STRENGTH AT 28 DAYS 3500 24.1 28 DAY SPECIMENS NOT YET TESTED * INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C 31, C 173 or 231, C 138, C 143, C 172, C 1064. 3) Moist cure 4) FRACTURE TYPES / % ~ · CONICAL CONICAL CONICAL AND AND SPLIT SHEAR SHEAR CoLuMNaR CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping compo~cnd Randall B HarVey,ET